Kajian Geometri Jalan terhadap Peningkatan Produktivitas Alat Angkut Overbarden pada Penambangan Batubara PT Putra Perkasa Abadi Site AMI, Desa Muara Tuhup, Kecamatan Laung Tuhup, Kabupaten Murung Raya, Provinsi Kalimantan Tengah

Abstract. PT Putra Perkasa Abadi is a company engaged in mining services located in Muara Tuhup Village, Laung Tuhup District, Murung Raya Regency, Central Kalimantan Province.. Based on the actual geometry in the field, there is a transportation road geometry that is not up to standard, resulting in the failure to achieve the production target for overburden transportation of 207,064.70 tons/month. The research aims to analyze the calculation of the transportation road geometry from the Danum Pit to the Disposal South, including the width of straight roads and curves, cross slope, road grade, superelevation, and curvature radius based on the Ministerial Decree 1827/K/30/MEM/2018 and AASHTO. The research findings indicate a discrepancy in the road geometry, with 3 road segments having a grade exceeding 8%, while 5 out of 8 straight road segments and 5 out of 7 curve segments have widths below standard. Cross slope and superelevation are also below standard, with 4 segments of cross slope greater than 4% and 3 curves having superelevation of less than 4%. As a result, the actual transportation production is only 134,772.38 Tons/Month against a target of 207,064.70 tons/month. After simulating road geometry improvements, transportation production increased to 217,454.17 Tons/Month. Abstrak. PT Putra Perkasa Abadi merupakan perusahaan yang bergerak di bidang jasa penambangan yang terletak di Desa Muara Tuhup, Kecamatan Laung Tuhup, Kabupaten Murung Raya, Provinsi Kalimantan Tengah. Berdasarkan geometri aktual di lapangan terdapat geometri jalan angkut yang belum standar, sehingga menyebabkan target produksi pengangkutan overburden 207.064,70 Ton/Bulan tidak tercapai. Adapun tujuan penelitian yang dilakukan yaitu analisis perhitungan geometri jalan angkut dari Pit Danum menuju Disposal South meliputi lebar jalan lurus dan tikungan, crossslope, grade jalan, superelevasi dan jari-jari tikungan berdasarkan Kepmen 1827/K/30/MEM/2018 dan AASHTO. Berdasarkan hasil penelitian ditemukan ketidaksesuaian geometri jalan, Terdapat 3 segmen jalan memiliki grade lebih 8%, sementara 5 dari 8 segmen jalan lurus dan 5 dari 7 segmen tikungan memiliki lebar dibawah standar. Cross slope dan superelevasi juga dibawah standar, dengan 4 segmen cross slope >4% dan 3 tikungan memiliki superelevasi <4%. Sehingga produksi pengangkutan aktual hanya 134.772,38 Ton/Bulan dari target 207.064,70 ton/bulan. Setelah dilakukanya simulasi perbaikan geometri jalan produksi pengangkutan mengalami peningkatan sebesar 217.454,17 Ton/Bulan.

Authors

Institutions

Publication Details

Journal
Bandung Conference Series Mining Engineering
Published
2025-08-03
DOI
https://doi.org/10.29313/bcsme.v5i2.19837
Primary Topic
Mining Techniques and Economics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Kajian Geometri Jalan terhadap Peningkatan Produktivitas Alat Angkut Overbarden pada Penambangan Batubara PT Putra Perkasa Abadi Site AMI, Desa Muara Tuhup, Kecamatan Laung Tuhup, Kabupaten Murung Raya, Provinsi Kalimantan Tengah

Zaenal Zaenal, Nopayanti, Linda Pulungan
Bandung Conference Series Mining Engineering
Mining Techniques and Economics
article

Kajian Geometri Jalan terhadap Peningkatan Produktivitas Alat Angkut Overbarden pada Penambangan Batubara PT Putra Perkasa Abadi Site AMI, Desa Muara Tuhup, Kecamatan Laung Tuhup, Kabupaten Murung Raya, Provinsi Kalimantan Tengah

Zaenal Zaenal, Nopayanti, Linda Pulungan
article en

Abstract

Abstract. PT Putra Perkasa Abadi is a company engaged in mining services located in Muara Tuhup Village, Laung Tuhup District, Murung Raya Regency, Central Kalimantan Province.. Based on the actual geometry in the field, there is a transportation road geometry that is not up to standard, resulting in the failure to achieve the production target for overburden transportation of 207,064.70 tons/month. The research aims to analyze the calculation of the transportation road geometry from the Danum Pit to the Disposal South, including the width of straight roads and curves, cross slope, road grade, superelevation, and curvature radius based on the Ministerial Decree 1827/K/30/MEM/2018 and AASHTO. The research findings indicate a discrepancy in the road geometry, with 3 road segments having a grade exceeding 8%, while 5 out of 8 straight road segments and 5 out of 7 curve segments have widths below standard. Cross slope and superelevation are also below standard, with 4 segments of cross slope greater than 4% and 3 curves having superelevation of less than 4%. As a result, the actual transportation production is only 134,772.38 Tons/Month against a target of 207,064.70 tons/month. After simulating road geometry improvements, transportation production increased to 217,454.17 Tons/Month. Abstrak. PT Putra Perkasa Abadi merupakan perusahaan yang bergerak di bidang jasa penambangan yang terletak di Desa Muara Tuhup, Kecamatan Laung Tuhup, Kabupaten Murung Raya, Provinsi Kalimantan Tengah. Berdasarkan geometri aktual di lapangan terdapat geometri jalan angkut yang belum standar, sehingga menyebabkan target produksi pengangkutan overburden 207.064,70 Ton/Bulan tidak tercapai. Adapun tujuan penelitian yang dilakukan yaitu analisis perhitungan geometri jalan angkut dari Pit Danum menuju Disposal South meliputi lebar jalan lurus dan tikungan, crossslope, grade jalan, superelevasi dan jari-jari tikungan berdasarkan Kepmen 1827/K/30/MEM/2018 dan AASHTO. Berdasarkan hasil penelitian ditemukan ketidaksesuaian geometri jalan, Terdapat 3 segmen jalan memiliki grade lebih 8%, sementara 5 dari 8 segmen jalan lurus dan 5 dari 7 segmen tikungan memiliki lebar dibawah standar. Cross slope dan superelevasi juga dibawah standar, dengan 4 segmen cross slope >4% dan 3 tikungan memiliki superelevasi <4%. Sehingga produksi pengangkutan aktual hanya 134.772,38 Ton/Bulan dari target 207.064,70 ton/bulan. Setelah dilakukanya simulasi perbaikan geometri jalan produksi pengangkutan mengalami peningkatan sebesar 217.454,17 Ton/Bulan.

Bandung Conference Series Mining EngineeringVol. 5(2)
Bandung Islamic University (ID)
Openalex Percentile: Top 74%
Mining Techniques and Economics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.