Comparative Analysis of Time and Cost Efficiency in Project Acceleration Strategies: A Case Study of the Construction of a Police Service Building

Optimal time and cost management are fundamental factors in ensuring the success of construction projects. One effective approach to address the risk of delays and cost overruns is the Time Cost Trade-Off (TCTO) method, which allows for project duration compression through resource adjustment and cost control. This study aims to analyze and compare two acceleration scenarios for the construction of the Police Service Building in Bungo Regency: additional working hours (overtime) and additional labor. This study uses a descriptive quantitative approach through a case study. The Critical Path Method (CPM) is applied to identify the critical path as the basis for implementing the TCTO strategy. The results of this study indicate that both scenarios can accelerate the project duration from 214 days to 130 days, with a time efficiency of 39.25%. The overtime scenario provides a cost efficiency of 0.38%, while additional labor results in an efficiency of 0.16%. Although overtime is more economical in nominal terms, the additional labor strategy is considered more stable and feasible to implement in public projects with sufficient work space. The results of this study contribute to strategic decision-making in data-driven construction project management.

Authors

Institutions

Publication Details

Journal
Global Education Journal
Published
2025-08-20
DOI
https://doi.org/10.59525/gej.v3i1.288
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Comparative Analysis of Time and Cost Efficiency in Project Acceleration Strategies: A Case Study of the Construction of a Police Service Building

Radinal Radinal, Devita Rahmawati, Widia Dini Afrida, Muhammad Sodri Renjani
Global Education Journal
Construction Project Management and Performance
article

Comparative Analysis of Time and Cost Efficiency in Project Acceleration Strategies: A Case Study of the Construction of a Police Service Building

Radinal Radinal, Devita Rahmawati, Widia Dini Afrida, Muhammad Sodri Renjani
article en

Abstract

Optimal time and cost management are fundamental factors in ensuring the success of construction projects. One effective approach to address the risk of delays and cost overruns is the Time Cost Trade-Off (TCTO) method, which allows for project duration compression through resource adjustment and cost control. This study aims to analyze and compare two acceleration scenarios for the construction of the Police Service Building in Bungo Regency: additional working hours (overtime) and additional labor. This study uses a descriptive quantitative approach through a case study. The Critical Path Method (CPM) is applied to identify the critical path as the basis for implementing the TCTO strategy. The results of this study indicate that both scenarios can accelerate the project duration from 214 days to 130 days, with a time efficiency of 39.25%. The overtime scenario provides a cost efficiency of 0.38%, while additional labor results in an efficiency of 0.16%. Although overtime is more economical in nominal terms, the additional labor strategy is considered more stable and feasible to implement in public projects with sufficient work space. The results of this study contribute to strategic decision-making in data-driven construction project management.

Global Education JournalVol. 3(1)
Universitas Muara Bungo (ID)
Openalex Percentile: Top 75%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Comparative Analysis of Time and Cost Efficiency in Project Acceleration Strategies: A Case Study of the Construction of a Police Service Building — Radinal Radinal, Devita Rahmawati, et al. · Global Education Journal (2025) | TGRS Research Map | TGRS