Optimizing Construction Project Scheduling and Resource Allocation Using Machine Learning Techniques

The construction industry faces persistent challenges in project delivery, with approximately 70% of projects experiencing schedule delays and cost overruns that significantly impact profitability and stakeholder satisfaction. Traditional project management approaches often rely on deterministic scheduling methods and historical experience, which fail to adequately account for the complex interdependencies and uncertainties inherent in construction projects. This research presents a comprehensive machine learning framework for optimizing construction project scheduling and resource allocation to minimize delays, reduce cost overruns, and improve overall project performance. A novel clustering-based resource optimization component is developed using K-means algorithm to identify similar project profiles and establish optimal resource allocation patterns. This approach enables construction managers to benchmark resource requirements against comparable projects and identify potential efficiency improvements. The methodology addresses key performance indicators including schedule variance, cost overruns, quality scores, and resource utilization rates to provide a holistic view of project performance.

Authors

Institutions

Publication Details

Journal
International Journal for Research in Applied Science and Engineering Technology
Published
2025-08-20
DOI
https://doi.org/10.22214/ijraset.2025.73529
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing Construction Project Scheduling and Resource Allocation Using Machine Learning Techniques

Amanpreet Singh
International Journal for Research in Applied Science and Engineering Technology
BIM and Construction Integration
article

Optimizing Construction Project Scheduling and Resource Allocation Using Machine Learning Techniques

Amanpreet Singh
article en

Abstract

The construction industry faces persistent challenges in project delivery, with approximately 70% of projects experiencing schedule delays and cost overruns that significantly impact profitability and stakeholder satisfaction. Traditional project management approaches often rely on deterministic scheduling methods and historical experience, which fail to adequately account for the complex interdependencies and uncertainties inherent in construction projects. This research presents a comprehensive machine learning framework for optimizing construction project scheduling and resource allocation to minimize delays, reduce cost overruns, and improve overall project performance. A novel clustering-based resource optimization component is developed using K-means algorithm to identify similar project profiles and establish optimal resource allocation patterns. This approach enables construction managers to benchmark resource requirements against comparable projects and identify potential efficiency improvements. The methodology addresses key performance indicators including schedule variance, cost overruns, quality scores, and resource utilization rates to provide a holistic view of project performance.

International Journal for Research in Applied Science and Engineering TechnologyVol. 13(8)
University of Rajasthan (IN)
Openalex Percentile: Top 77%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.