Designing future residential LV networks with EVs and PVs: a bi-period OPF-based approach

• Proposes a bi-period AC OPF for planning brand-new LV networks with 100% EV and PV. • Minimizes transformer and conductor/cable cost for different tap changer technologies. • Considers locational effects of where the LV network is connected to an MV feeder. • LV OLTC with thin cables: best design for large LV networks at the end of MV feeders. • Off-LTC with thick cables: best design for LV networks near the start of MV feeders. The proliferation of electric vehicles (EVs) and residential photovoltaic (PV) systems in three-phase low voltage (LV) networks is prompting the need for cost-effective designs in brand-new neighborhoods that address the challenges of managing voltage (drop/rise) and asset congestion. This requires selecting the most appropriate conductors, transformers, and voltage regulation devices, which becomes a complex combinatorial problem. This paper proposes a bi-period three-phase AC Optimal Power Flow methodology to minimize asset costs while capturing the time-dependent impacts of EVs, PVs, and the locational effects on the transformer’s primary voltage. The proposed approach is demonstrated using two realistic residential Australian LV networks: one having a single circuit with 31 houses, and another having multiple circuits with 89 houses. The approach identified optimal designs for both networks that minimize costs addressing the technical challenges. For single-circuit networks, off-load tap changers with thicker conductors is the most cost-effective design for both close and distant locations (relative to the primary substation). However, in multi-circuit networks, particularly in distant locations with significant voltage variations, on-load tap changers with thinner conductors is the most cost-effective design. These findings highlight the importance of considering individual network characteristics to optimally design brand-new LV networks with EVs and PVs.

Authors

Institutions

Publication Details

Journal
Electric Power Systems Research
Published
2025-08-20
DOI
https://doi.org/10.1016/j.epsr.2025.112109
Primary Topic
Electric Vehicles and Infrastructure
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Designing future residential LV networks with EVs and PVs: a bi-period OPF-based approach

Luis F. Ochoa, Michael Z. Liu, Christos G. Kaloudas, Luis Gutierrez‐Lagos et al.
Electric Power Systems Research
Electric Vehicles and Infrastructure
article

Designing future residential LV networks with EVs and PVs: a bi-period OPF-based approach

Luis F. Ochoa, Michael Z. Liu, Christos G. Kaloudas, Luis Gutierrez‐Lagos, Arthur Gonçalves Givisiez, Fahmi Firdaus Angkasa
article en

Abstract

• Proposes a bi-period AC OPF for planning brand-new LV networks with 100% EV and PV. • Minimizes transformer and conductor/cable cost for different tap changer technologies. • Considers locational effects of where the LV network is connected to an MV feeder. • LV OLTC with thin cables: best design for large LV networks at the end of MV feeders. • Off-LTC with thick cables: best design for LV networks near the start of MV feeders. The proliferation of electric vehicles (EVs) and residential photovoltaic (PV) systems in three-phase low voltage (LV) networks is prompting the need for cost-effective designs in brand-new neighborhoods that address the challenges of managing voltage (drop/rise) and asset congestion. This requires selecting the most appropriate conductors, transformers, and voltage regulation devices, which becomes a complex combinatorial problem. This paper proposes a bi-period three-phase AC Optimal Power Flow methodology to minimize asset costs while capturing the time-dependent impacts of EVs, PVs, and the locational effects on the transformer’s primary voltage. The proposed approach is demonstrated using two realistic residential Australian LV networks: one having a single circuit with 31 houses, and another having multiple circuits with 89 houses. The approach identified optimal designs for both networks that minimize costs addressing the technical challenges. For single-circuit networks, off-load tap changers with thicker conductors is the most cost-effective design for both close and distant locations (relative to the primary substation). However, in multi-circuit networks, particularly in distant locations with significant voltage variations, on-load tap changers with thinner conductors is the most cost-effective design. These findings highlight the importance of considering individual network characteristics to optimally design brand-new LV networks with EVs and PVs.

Electric Power Systems ResearchVol. 250
The University of Melbourne (AU), Adolfo Ibáñez University (CL), Electricity North West (United Kingdom) (GB)
Sustainable cities and communities
Openalex Percentile: Top 80%
Electric Vehicles and Infrastructure
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.