Texas Loads Ride Toward Grid Stability: Voltage Ride Through of Large Power Electronic Loads

ERCOT, the independent system operator (ISO) for the Texas region, USA, continuously assesses the reliability of its grid. With the increase of large loads interconnecting to the electric grid, including large data centers and crypto mining centers, maintaining grid reliability can become more challenging depending on the size of the load, its geographical location, its ramping controls, and network conditions. Further, a load’s lack of voltage ride-through (VRT) capability or frequency ride-through (FRT) capability could degrade system reliability. Additionally, these loads could introduce new vulnerabilities to sub-synchronous oscillations (SSO) or sub-synchronous control interactions (SSCI). This article will review realistic critical scenarios that require planning or operation level studies to assess reliability. These assessments will consider VRT and FRT tests with updated models, evaluations of large load on regions with known stability constraints, system impact of co-located load with generation, SSO/SSCI vulnerabilities and other similar reliability challenges.

Authors

Publication Details

Journal
IEEE Power and Energy Magazine
Published
2025-08-20
DOI
https://doi.org/10.1109/mpe.2025.3564963
Primary Topic
Real-time simulation and control systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Texas Loads Ride Toward Grid Stability: Voltage Ride Through of Large Power Electronic Loads

Jonathan Rose, Yunzhi Cheng, José Conto, John Schmall
IEEE Power and Energy Magazine
Real-time simulation and control systems
article

Texas Loads Ride Toward Grid Stability: Voltage Ride Through of Large Power Electronic Loads

Jonathan Rose, Yunzhi Cheng, José Conto, John Schmall
article en

Abstract

ERCOT, the independent system operator (ISO) for the Texas region, USA, continuously assesses the reliability of its grid. With the increase of large loads interconnecting to the electric grid, including large data centers and crypto mining centers, maintaining grid reliability can become more challenging depending on the size of the load, its geographical location, its ramping controls, and network conditions. Further, a load’s lack of voltage ride-through (VRT) capability or frequency ride-through (FRT) capability could degrade system reliability. Additionally, these loads could introduce new vulnerabilities to sub-synchronous oscillations (SSO) or sub-synchronous control interactions (SSCI). This article will review realistic critical scenarios that require planning or operation level studies to assess reliability. These assessments will consider VRT and FRT tests with updated models, evaluations of large load on regions with known stability constraints, system impact of co-located load with generation, SSO/SSCI vulnerabilities and other similar reliability challenges.

IEEE Power and Energy MagazineVol. 23(5)
Affordable and clean energy
Openalex Percentile: Top 74%
Real-time simulation and control systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.