Rancangan Sistem Penyaliran Tambang di CV Ujang Rosyid Desa Haruman, Kecamatan Leles, Kabupaten Garut, Provinsi Jawa Barat

Abstract, CV Ujang Rosyid is a mining company specializing in sandstone mining, located in Haruman Village, Leles District, Garut Regency. The company has a 4.44-hectare mining permit (IUP) and operates an open-pit mining system using the side hill method. For the area of the rain catchment area has an area of 24 hectares or 240,437 m2, also obtained the planned rainfall in the 10-year period of 88.98 mm/day, rainfall intensity of 12.24 mm/hour. From this data can calculate the water discharge that will enter the mining area is 10,593 m3. For the dimensions of the ditch has 6 segments where segment 1 has the same dimensions as segment 2, surface width of 1.73m, base width of 0.73m, the height of 1.20m, segment 3 has the same dimensions as segment 4, surface width of 1.91m, base width of 1.31m, the channel height of 1.20m, then segment 5 has the same dimensions as segment 6, namely the surface width of 1.60m, the channel base width of 0.40m, the channel height of 1.20m. Then for the sedimentation pond in the research area with dimensions of 5m depth, the pool area is 2,645 m2, width 29.7m, length 89.1m, dredging time is once every 28 days. Abstrak: CV Ujang Rosyid adalah perusahaan tambang yang bergerak di bidang pertambangan batu pasir, berlokasi di Desa Haruman, Kecamatan Leles, Kabupaten Garut. Perusahaan ini memiliki Izin Usaha Pertambangan (IUP) seluas 4,44 hektar dan mengoperasikan sistem tambang terbuka dengan metode lereng bukit. Luas daerah tangkapan hujan (DAS) adalah 24 hektar atau 240.437 m², dan curah hujan rencana dalam kurun waktu 10 tahun sebesar 88,98 mm/hari dengan intensitas hujan 12,24 mm/jam. Dari data ini, dapat dihitung debit air yang akan masuk ke area tambang sebesar 10.593 m³. Untuk dimensi parit memiliki 6 segmen di mana segmen 1 memiliki dimensi yang sama dengan segmen 2, lebar permukaan 1,73m, lebar dasar 0,73m, tinggi 1,20m, segmen 3 memiliki dimensi yang sama dengan segmen 4, lebar permukaan 1,91m, lebar dasar 1,31m, tinggi saluran 1,20m, kemudian segmen 5 memiliki dimensi yang sama dengan segmen 6, yaitu lebar permukaan 1,60m, lebar dasar saluran 0,40m, tinggi saluran 1,20m. Kemudian untuk kolam sedimentasi di daerah penelitian dengan dimensi kedalaman 5m, luas kolam adalah 2.645 m2, lebar 29,7m, panjang 89,1m, waktu pengerukan adalah sekali setiap 28 hari.

Authors

Institutions

Publication Details

Journal
Bandung Conference Series Mining Engineering
Published
2025-08-07
DOI
https://doi.org/10.29313/bcsme.v5i2.20747
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Rancangan Sistem Penyaliran Tambang di CV Ujang Rosyid Desa Haruman, Kecamatan Leles, Kabupaten Garut, Provinsi Jawa Barat

Yunus Ashari, Dono Guntoro, Firdan Daris Ferdiansyah
Bandung Conference Series Mining Engineering
Management and Optimization Techniques
article

Rancangan Sistem Penyaliran Tambang di CV Ujang Rosyid Desa Haruman, Kecamatan Leles, Kabupaten Garut, Provinsi Jawa Barat

Yunus Ashari, Dono Guntoro, Firdan Daris Ferdiansyah
article en

Abstract

Abstract, CV Ujang Rosyid is a mining company specializing in sandstone mining, located in Haruman Village, Leles District, Garut Regency. The company has a 4.44-hectare mining permit (IUP) and operates an open-pit mining system using the side hill method. For the area of the rain catchment area has an area of 24 hectares or 240,437 m2, also obtained the planned rainfall in the 10-year period of 88.98 mm/day, rainfall intensity of 12.24 mm/hour. From this data can calculate the water discharge that will enter the mining area is 10,593 m3. For the dimensions of the ditch has 6 segments where segment 1 has the same dimensions as segment 2, surface width of 1.73m, base width of 0.73m, the height of 1.20m, segment 3 has the same dimensions as segment 4, surface width of 1.91m, base width of 1.31m, the channel height of 1.20m, then segment 5 has the same dimensions as segment 6, namely the surface width of 1.60m, the channel base width of 0.40m, the channel height of 1.20m. Then for the sedimentation pond in the research area with dimensions of 5m depth, the pool area is 2,645 m2, width 29.7m, length 89.1m, dredging time is once every 28 days. Abstrak: CV Ujang Rosyid adalah perusahaan tambang yang bergerak di bidang pertambangan batu pasir, berlokasi di Desa Haruman, Kecamatan Leles, Kabupaten Garut. Perusahaan ini memiliki Izin Usaha Pertambangan (IUP) seluas 4,44 hektar dan mengoperasikan sistem tambang terbuka dengan metode lereng bukit. Luas daerah tangkapan hujan (DAS) adalah 24 hektar atau 240.437 m², dan curah hujan rencana dalam kurun waktu 10 tahun sebesar 88,98 mm/hari dengan intensitas hujan 12,24 mm/jam. Dari data ini, dapat dihitung debit air yang akan masuk ke area tambang sebesar 10.593 m³. Untuk dimensi parit memiliki 6 segmen di mana segmen 1 memiliki dimensi yang sama dengan segmen 2, lebar permukaan 1,73m, lebar dasar 0,73m, tinggi 1,20m, segmen 3 memiliki dimensi yang sama dengan segmen 4, lebar permukaan 1,91m, lebar dasar 1,31m, tinggi saluran 1,20m, kemudian segmen 5 memiliki dimensi yang sama dengan segmen 6, yaitu lebar permukaan 1,60m, lebar dasar saluran 0,40m, tinggi saluran 1,20m. Kemudian untuk kolam sedimentasi di daerah penelitian dengan dimensi kedalaman 5m, luas kolam adalah 2.645 m2, lebar 29,7m, panjang 89,1m, waktu pengerukan adalah sekali setiap 28 hari.

Bandung Conference Series Mining EngineeringVol. 5(2)
Bandung Islamic University (ID)
Openalex Percentile: Top 68%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.