Three-Stage Optimization-Based Framework for Grid-Connected Sizing of a PV Power Plant System

The grid-connected sizing of a photovoltaic (PV) power plant system aims to determine the equipment and components necessary to operate and integrate PV panels into an on-grid system with compatibility, efficiency, affordability, and reliability. In this context, this article proposes a new three-stage optimization-based framework for the grid-connected sizing of a PV power plant. In Stage 1, the <inline-formula xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink"><tex-math notation="LaTeX">$k$</tex-math></inline-formula>-means clustering algorithm is utilized to determine the placement and dimensions of the inverters, as well as the number of strings and the arrangement of PV modules in strings. During Stage 2, the DC wiring is sized to facilitate the connection between the PV strings and the inverters. Finally, in Stage 3, the AC wiring is sized to connect the inverters to the power substation. Stages 2 and 3 are formulated as mixed-integer linear programming problems to minimize investment costs and reduce AC power losses. The framework is implemented using different tools and libraries, including Quantum Geographic Information System for geospatial panel placement, Python libraries such as scikit-learn for clustering, and Pyomo for modeling the optimization problem of Stages 2 and 3 with the Gurobi solver. A real-world case study of a PV power plant located in Brazil, which covers an area of 13 000 m<inline-formula xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink"><tex-math notation="LaTeX">$^{2}$</tex-math></inline-formula> and a nominal power of 1.2 MW, is used to validate the proposed framework. The results demonstrate the robustness, feasibility, and scalability of the proposed methodology.

Authors

Institutions

Publication Details

Journal
IEEE Journal of Photovoltaics
Published
2025-08-19
DOI
https://doi.org/10.1109/jphotov.2025.3596707
Primary Topic
Photovoltaic System Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Three-Stage Optimization-Based Framework for Grid-Connected Sizing of a PV Power Plant System

Marcos J. Rider, Marina Lavorato, Juan Carlos Córtez, Jéssica Alice A. Silva et al.
IEEE Journal of Photovoltaics
Photovoltaic System Optimization Techniques
article

Three-Stage Optimization-Based Framework for Grid-Connected Sizing of a PV Power Plant System

Marcos J. Rider, Marina Lavorato, Juan Carlos Córtez, Jéssica Alice A. Silva, R. H.
article en

Abstract

The grid-connected sizing of a photovoltaic (PV) power plant system aims to determine the equipment and components necessary to operate and integrate PV panels into an on-grid system with compatibility, efficiency, affordability, and reliability. In this context, this article proposes a new three-stage optimization-based framework for the grid-connected sizing of a PV power plant. In Stage 1, the <inline-formula xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink"><tex-math notation="LaTeX">$k$</tex-math></inline-formula>-means clustering algorithm is utilized to determine the placement and dimensions of the inverters, as well as the number of strings and the arrangement of PV modules in strings. During Stage 2, the DC wiring is sized to facilitate the connection between the PV strings and the inverters. Finally, in Stage 3, the AC wiring is sized to connect the inverters to the power substation. Stages 2 and 3 are formulated as mixed-integer linear programming problems to minimize investment costs and reduce AC power losses. The framework is implemented using different tools and libraries, including Quantum Geographic Information System for geospatial panel placement, Python libraries such as scikit-learn for clustering, and Pyomo for modeling the optimization problem of Stages 2 and 3 with the Gurobi solver. A real-world case study of a PV power plant located in Brazil, which covers an area of 13 000 m<inline-formula xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink"><tex-math notation="LaTeX">$^{2}$</tex-math></inline-formula> and a nominal power of 1.2 MW, is used to validate the proposed framework. The results demonstrate the robustness, feasibility, and scalability of the proposed methodology.

IEEE Journal of PhotovoltaicsVol. 15(6)
Universidade Estadual de Campinas (UNICAMP) (BR)
Fundação de Amparo à Pesquisa do Estado de São Paulo, Conselho Nacional de Desenvolvimento Científico e Tecnológico
Affordable and clean energy
Openalex Percentile: Top 86%
Photovoltaic System Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.