An Integrated MILP Model for Scheduling of Steelmaking-Continuous Casting With Cranes

Steelmaking-continuous casting (SCC) is the crucial step in steel production, and the process involves multiple production equipment (converters, refiners and continuous casting machine) and coordinated transport by multiple cranes. Scientific and reasonable scheduling of SCC with cranes can regulate the production rhythm and improve the efficiency of steel production. However, production equipment scheduling and crane scheduling are often solved separately in existing studies of SCC, which ignores the coupling relationship between them. Therefore, this paper proposes an integrated mixed integer linear programming (MILP) model for the SCC scheduling problem with cranes. Firstly, a MILP model with minimum residence time and completion time as objectives is established. Secondly, a disjunctive graph is established to describe the relationship between the processing tasks of the production equipment and the transport tasks of the crane. Thirdly, A new MILP model is proposed by simplifying the crane transport constraints based on the disjunctive graph. Finally, the validity and the superior computational performance of the new model are verified through 35 instances.

Authors

Institutions

Publication Details

Journal
IEEE Robotics and Automation Letters
Published
2025-08-19
DOI
https://doi.org/10.1109/lra.2025.3600104
Citations
14
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
17.39
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An Integrated MILP Model for Scheduling of Steelmaking-Continuous Casting With Cranes

Mingzhong Li, Liangliang Sun, Tianhao Fu, Natalja M. Matsveichuk et al.
14 citations
IEEE Robotics and Automation Letters
Manufacturing Process and Optimization
17.39
article

An Integrated MILP Model for Scheduling of Steelmaking-Continuous Casting With Cranes

Mingzhong Li, Liangliang Sun, Tianhao Fu, Natalja M. Matsveichuk, Yuri N. Sotskov, Yunpeng Li, Jing Liu, Zhenghao Song, Xiaojian Hao
article en
14 citations

Abstract

Steelmaking-continuous casting (SCC) is the crucial step in steel production, and the process involves multiple production equipment (converters, refiners and continuous casting machine) and coordinated transport by multiple cranes. Scientific and reasonable scheduling of SCC with cranes can regulate the production rhythm and improve the efficiency of steel production. However, production equipment scheduling and crane scheduling are often solved separately in existing studies of SCC, which ignores the coupling relationship between them. Therefore, this paper proposes an integrated mixed integer linear programming (MILP) model for the SCC scheduling problem with cranes. Firstly, a MILP model with minimum residence time and completion time as objectives is established. Secondly, a disjunctive graph is established to describe the relationship between the processing tasks of the production equipment and the transport tasks of the crane. Thirdly, A new MILP model is proposed by simplifying the crane transport constraints based on the disjunctive graph. Finally, the validity and the superior computational performance of the new model are verified through 35 instances.

IEEE Robotics and Automation LettersVol. 10(10)
National Academy of Sciences of Belarus (BY), Hebei University of Technology (CN), Belarusian State Agrarian Technical University (BY), United Institute of Informatics Problems (BY), Northeastern University (CN)
Openalex Percentile: Top 1%
Manufacturing Process and Optimization
17.39
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

An Integrated MILP Model for Scheduling of Steelmaking-Continuous Casting With Cranes — Mingzhong Li, Liangliang Sun, et al. · IEEE Robotics and Automation Letters (2025) | TGRS Research Map | TGRS