Errors in the design of small and ultra-small waste water treatment plants of northern design, their calculation and analysis of the results obtained

The calculation of the current station of sewage treatment plants of the Northern was carried out on the basis of experimental data, including the results of laboratory studies of design characteristics and measurements of hydraulic parameters. The calculation was performed using mathematical models of the SRI VODGEO/SamSTU and SNiP 2.04.03-85. The calculation of the station and operational parameters is analyzed. Underestimated volumes of the station capacitive equipment were revealed at the design stage, which later led to an abnormal quality of waste water treatment. As a result of the conducted research, there were grounds for the reconstruction of the WWTP to equip the station with a denerifier and increase the aeration zone.

Authors

Institutions

Publication Details

Journal
Gradostroitelʹstvo i arhitektura
Published
2025-08-19
DOI
https://doi.org/10.17673/vestnik.2025.03.05
Primary Topic
Economic and Industrial Development
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Errors in the design of small and ultra-small waste water treatment plants of northern design, their calculation and analysis of the results obtained

Denis Butko, Stepan Al. Morozov
Gradostroitelʹstvo i arhitektura
Economic and Industrial Development
article

Errors in the design of small and ultra-small waste water treatment plants of northern design, their calculation and analysis of the results obtained

Denis Butko, Stepan Al. Morozov
article en

Abstract

The calculation of the current station of sewage treatment plants of the Northern was carried out on the basis of experimental data, including the results of laboratory studies of design characteristics and measurements of hydraulic parameters. The calculation was performed using mathematical models of the SRI VODGEO/SamSTU and SNiP 2.04.03-85. The calculation of the station and operational parameters is analyzed. Underestimated volumes of the station capacitive equipment were revealed at the design stage, which later led to an abnormal quality of waste water treatment. As a result of the conducted research, there were grounds for the reconstruction of the WWTP to equip the station with a denerifier and increase the aeration zone.

Gradostroitelʹstvo i arhitekturaVol. 15(3)
Institute of Service and Entrepreneurship of DGTU (RU), Don State Technical University (RU)
Openalex Percentile: Top 71%
Economic and Industrial Development
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Errors in the design of small and ultra-small waste water treatment plants of northern design, their calculation and analysis of the results obtained — Denis Butko, Stepan Al. Morozov · Gradostroitelʹstvo i arhitektura (2025) | TGRS Research Map | TGRS