World's First Coil Deployed ESP System in a SAGD Well

Abstract The objective of the work described in this paper is the evaluation of an alternative Electric Submersible Pump (ESP) deployment and removal technique utilizing a world's first coiled tubing deployed ESP system and completions design in a SAGD well. The work described in this paper was performed at CNOOC's Long Lake field in Northern Alberta in 2024. For this field pilot, coil deployed ESP systems were installed in both slant and vertical spud SAGD wells. The wells selected for these pilot installations were completed with 244.5 mm (9 5/8") intermediate casings and an existing 52.4 mm (2-1/16″) guide string tubular (installed as a guide string for the wells coil tubing instrumentation string) that was deployed into the lateral section of the well. This completion called for 146.05 mm (5 3/4") OD production tubing to be installed from surface to the pump landing depth in the near horizontal section of the wells and at a length long enough to encapsulate the entire ESP string. A 400 series SAGD ESP system was utilized with a custom Motor Lead Extension (MLE) cable to coil cable down-hole splicing assembly and coil to ESP connector assembly comprising a combination power cable pass-through/pump hold-down mandrel/discharge head. The ESP power cable for this system was fully integrated into a coiled tubing string. The ESP system was assembled and loaded into a lubricator after which the coiled tubing power cable was connected to the down-hole motor head assembly. The lubricator, with ESP inside, was then suspended and supported by crane and connected to the wellhead and the ESP system deployed into the 146.05 mm (5 3/4") production tubing and landed into a pump seating nipple. This paper will describe the development history and design of this novel Coil-Tubing Deployed ESP (CT-ESP) as well as the results from two field installations.

Authors

Institutions

Publication Details

Published
2025-08-18
DOI
https://doi.org/10.2118/225250-ms
Primary Topic
Oil and Gas Production Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

World's First Coil Deployed ESP System in a SAGD Well

Qiao Jin, R. G. Colbert, Mark Padberg, Leon Waldner et al.
Oil and Gas Production Techniques
article

World's First Coil Deployed ESP System in a SAGD Well

Qiao Jin, R. G. Colbert, Mark Padberg, Leon Waldner, Idowu Adeniyi, Gerry Chalifoux
article en

Abstract

Abstract The objective of the work described in this paper is the evaluation of an alternative Electric Submersible Pump (ESP) deployment and removal technique utilizing a world's first coiled tubing deployed ESP system and completions design in a SAGD well. The work described in this paper was performed at CNOOC's Long Lake field in Northern Alberta in 2024. For this field pilot, coil deployed ESP systems were installed in both slant and vertical spud SAGD wells. The wells selected for these pilot installations were completed with 244.5 mm (9 5/8") intermediate casings and an existing 52.4 mm (2-1/16″) guide string tubular (installed as a guide string for the wells coil tubing instrumentation string) that was deployed into the lateral section of the well. This completion called for 146.05 mm (5 3/4") OD production tubing to be installed from surface to the pump landing depth in the near horizontal section of the wells and at a length long enough to encapsulate the entire ESP string. A 400 series SAGD ESP system was utilized with a custom Motor Lead Extension (MLE) cable to coil cable down-hole splicing assembly and coil to ESP connector assembly comprising a combination power cable pass-through/pump hold-down mandrel/discharge head. The ESP power cable for this system was fully integrated into a coiled tubing string. The ESP system was assembled and loaded into a lubricator after which the coiled tubing power cable was connected to the down-hole motor head assembly. The lubricator, with ESP inside, was then suspended and supported by crane and connected to the wellhead and the ESP system deployed into the 146.05 mm (5 3/4") production tubing and landed into a pump seating nipple. This paper will describe the development history and design of this novel Coil-Tubing Deployed ESP (CT-ESP) as well as the results from two field installations.

Daqing Oilfield General Hospital (CN), Universitatea Din Petrosani (RO)
Openalex Percentile: Top 74%
Oil and Gas Production Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.