Optimizing plastic product manufacturing scheduling: an integrated approach to minimize setup costs and tardiness with preventive maintenance considerations

Abstract In the competitive landscape of plastic product manufacturing, optimizing production scheduling is crucial for enhancing efficiency and reducing costs. This paper presents an integrated approach to address the unrelated parallel machine scheduling problem (UPMSP) with a focus on minimizing setup costs and tardiness penalties, while also considering the necessity of preventive maintenance. We incorporate practical constraints such as release time, machine eligibility, and delivery due dates into our model to ensure its applicability to real‐world manufacturing scenarios. We propose a mixed‐integer linear programming model designed to minimize the total costs associated with setup and tardiness. To solve this complex problem, we develop a constructive heuristic and an adaptive large neighborhood search (ALNS) algorithm, which introduces novel destroy and repair operators. These algorithms are tailored to the specific structure of the UPMSP and are tested through a case study involving a real plastic product manufacturer. Results from the case study demonstrate that our proposed solution method significantly outperforms the company's current planning approach, achieving a reduction in total costs by 73.11%. Furthermore, the ALNS algorithm's performance is validated through numerical experiments on a range of randomly generated instances, showcasing its ability to provide high‐quality solutions within practical computation times.

Authors

Institutions

Publication Details

Journal
International Transactions in Operational Research
Published
2025-08-17
DOI
https://doi.org/10.1111/itor.70085
Citations
2
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
2.48
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimizing plastic product manufacturing scheduling: an integrated approach to minimize setup costs and tardiness with preventive maintenance considerations

Zhaohui Li, Tianhong Wu, Yantong Li, Chuang Zhang et al.
2 citations
International Transactions in Operational Research
Scheduling and Optimization Algorithms
2.48
article

Optimizing plastic product manufacturing scheduling: an integrated approach to minimize setup costs and tardiness with preventive maintenance considerations

Zhaohui Li, Tianhong Wu, Yantong Li, Chuang Zhang, Shanshan Zhou
article en
2 citations

Abstract

Abstract In the competitive landscape of plastic product manufacturing, optimizing production scheduling is crucial for enhancing efficiency and reducing costs. This paper presents an integrated approach to address the unrelated parallel machine scheduling problem (UPMSP) with a focus on minimizing setup costs and tardiness penalties, while also considering the necessity of preventive maintenance. We incorporate practical constraints such as release time, machine eligibility, and delivery due dates into our model to ensure its applicability to real‐world manufacturing scenarios. We propose a mixed‐integer linear programming model designed to minimize the total costs associated with setup and tardiness. To solve this complex problem, we develop a constructive heuristic and an adaptive large neighborhood search (ALNS) algorithm, which introduces novel destroy and repair operators. These algorithms are tailored to the specific structure of the UPMSP and are tested through a case study involving a real plastic product manufacturer. Results from the case study demonstrate that our proposed solution method significantly outperforms the company's current planning approach, achieving a reduction in total costs by 73.11%. Furthermore, the ALNS algorithm's performance is validated through numerical experiments on a range of randomly generated instances, showcasing its ability to provide high‐quality solutions within practical computation times.

International Transactions in Operational ResearchVol. 33(2)
Dalian Maritime University (CN), Shaanxi University of Science and Technology (CN)
Openalex Percentile: Top 9%
Scheduling and Optimization Algorithms
2.48
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Optimizing plastic product manufacturing scheduling: an integrated approach to minimize setup costs and tardiness with preventive maintenance considerations — Zhaohui Li, Tianhong Wu, et al. · International Transactions in Operational Research (2025) | TGRS Research Map | TGRS