The analysis of ground surface displacements and deformations in re-working of pillars on the basis of integrated monitoring of rock mass

In the modern mining industry, the room-and-pillar mining system, previously characterized by non-extractable pillars to ensure stability of rock mass, transforms into the methods of complete and partial extraction of ore reserves from pillars. This allows essential enhancement of mining safety and efficiency in the conditions of depletion of ore reserves, and also requires integrated monitoring of ground surface displacements and rock mass assessment above re-worked pillars. To this effect, this article analyzes mining conditions in re-working of the Zhezkazgan deposit in the Republic of Kazakhstan. For the assessment of workability of re-extraction of ore reserves from pillars, and toward ground control and mining safety, the integrated monitoring of ground surface was carried out. The article describes the visual inspection control of the room-and-pillar system components. The presented results of satellite monitoring determined the ground surface displacement parameters at the Zhaman-Aibat and Zhezkazgan deposits, including areas unequipped with survey lines. The comparison of the data of interferometric synthetic aperture radar and instrumental levelling results over the same period of time proved the accuracy of the developed technology to a few millimeters. This made a framework for a new displacement calculation procedure aimed at preserving safety of transportation routes and engineering facilities at the Zhaman-Aibat deposits.The article reports R&D results within the framework of Project No. IRN AR14972873 Resource-Saving Technologies of Ore Mining at Increased Completeness of Mineral Extraction under grant support from the Committee of Science of the Ministry of Science and Higher Education of the Republic of Kazakhstan.

Authors

Publication Details

Journal
Eurasian Mining
Published
2025-07-25
DOI
https://doi.org/10.17580/em.2025.01.07
Primary Topic
Geotechnical and Geomechanical Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The analysis of ground surface displacements and deformations in re-working of pillars on the basis of integrated monitoring of rock mass

Daulet Takhanov, Д.Т. Ивадилинова, М. Zh. Balpanova, Abzal Zhienbayev
Eurasian Mining
Geotechnical and Geomechanical Engineering
article

The analysis of ground surface displacements and deformations in re-working of pillars on the basis of integrated monitoring of rock mass

Daulet Takhanov, Д.Т. Ивадилинова, М. Zh. Balpanova, Abzal Zhienbayev
article en

Abstract

In the modern mining industry, the room-and-pillar mining system, previously characterized by non-extractable pillars to ensure stability of rock mass, transforms into the methods of complete and partial extraction of ore reserves from pillars. This allows essential enhancement of mining safety and efficiency in the conditions of depletion of ore reserves, and also requires integrated monitoring of ground surface displacements and rock mass assessment above re-worked pillars. To this effect, this article analyzes mining conditions in re-working of the Zhezkazgan deposit in the Republic of Kazakhstan. For the assessment of workability of re-extraction of ore reserves from pillars, and toward ground control and mining safety, the integrated monitoring of ground surface was carried out. The article describes the visual inspection control of the room-and-pillar system components. The presented results of satellite monitoring determined the ground surface displacement parameters at the Zhaman-Aibat and Zhezkazgan deposits, including areas unequipped with survey lines. The comparison of the data of interferometric synthetic aperture radar and instrumental levelling results over the same period of time proved the accuracy of the developed technology to a few millimeters. This made a framework for a new displacement calculation procedure aimed at preserving safety of transportation routes and engineering facilities at the Zhaman-Aibat deposits.The article reports R&D results within the framework of Project No. IRN AR14972873 Resource-Saving Technologies of Ore Mining at Increased Completeness of Mineral Extraction under grant support from the Committee of Science of the Ministry of Science and Higher Education of the Republic of Kazakhstan.

Eurasian Mining
Sustainable cities and communities
Openalex Percentile: Top 76%
Geotechnical and Geomechanical Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

The analysis of ground surface displacements and deformations in re-working of pillars on the basis of integrated monitoring of rock mass — Daulet Takhanov, Д.Т. Ивадилинова, et al. · Eurasian Mining (2025) | TGRS Research Map | TGRS