Dual-resource flexible job shop scheduling considering worker proficiency differences

• The paper is based on the “people-oriented manufacturing” advocated by Industry 5.0. • The auxiliary production time is incorporated into the scheduling model. • The improved optimization algorithm improves the efficiency of scheduling problems. • Cases validate the efficiency of considering individual difference in reducing time. • Results provide reference for enterprises to deploy differentiated workers. Currently, the increasing attention to resource constraints in production systems is driven by the notable distribution of workers across all age groups within the production shop and the discrepancy of their proficiency in operating machines. It takes time and knowledge to improve workers’ proficiency. And as the workforce retires later, the longer working hours of older workers can help them gain more experience. With the improvement of accumulated experience, the time spent on human-related tasks such as machine debugging, checking, cleaning, and other necessary preparation processes before processing will be significantly reduced. Considering these factors is crucial when making production decisions, necessitating the adaptation of job assignments to suit the capabilities of individual workers. Through this approach, the economic indicators of ‘people-oriented manufacturing’ advocated by Industry 5.0 and workshop production can be jointly realized. In this scenario, a mathematical model is constructed with the objective of minimizing the sum of setup time and processing time for the double-resource flexible job shop scheduling problem (DRCFJSP), considering the differences in worker skill levels and varying process setup times based on this. The model takes the skills and proficiency of workers into consideration as well. Given the problem’s characteristics, the migratory bird optimization algorithm (MBO) is applied to address this issue. Finally, a comparative experiment is carried out on a simulation example. The experimental results verify that incorporating the influence of workers with different proficiency on preparation time into the scheduling model can significantly optimize the total production completion time.

Authors

Institutions

Publication Details

Journal
Computers & Operations Research
Published
2025-07-18
DOI
https://doi.org/10.1016/j.cor.2025.107216
Citations
7
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
8.70

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Dual-resource flexible job shop scheduling considering worker proficiency differences

Jin Wang, Di Fan, Chuang Wang, Yang Liu et al.
7 citations
Computers & Operations Research
Scheduling and Optimization Algorithms
8.70
article

Dual-resource flexible job shop scheduling considering worker proficiency differences

Jin Wang, Di Fan, Chuang Wang, Yang Liu, Shan Ren
article en
7 citations

Abstract

• The paper is based on the “people-oriented manufacturing” advocated by Industry 5.0. • The auxiliary production time is incorporated into the scheduling model. • The improved optimization algorithm improves the efficiency of scheduling problems. • Cases validate the efficiency of considering individual difference in reducing time. • Results provide reference for enterprises to deploy differentiated workers. Currently, the increasing attention to resource constraints in production systems is driven by the notable distribution of workers across all age groups within the production shop and the discrepancy of their proficiency in operating machines. It takes time and knowledge to improve workers’ proficiency. And as the workforce retires later, the longer working hours of older workers can help them gain more experience. With the improvement of accumulated experience, the time spent on human-related tasks such as machine debugging, checking, cleaning, and other necessary preparation processes before processing will be significantly reduced. Considering these factors is crucial when making production decisions, necessitating the adaptation of job assignments to suit the capabilities of individual workers. Through this approach, the economic indicators of ‘people-oriented manufacturing’ advocated by Industry 5.0 and workshop production can be jointly realized. In this scenario, a mathematical model is constructed with the objective of minimizing the sum of setup time and processing time for the double-resource flexible job shop scheduling problem (DRCFJSP), considering the differences in worker skill levels and varying process setup times based on this. The model takes the skills and proficiency of workers into consideration as well. Given the problem’s characteristics, the migratory bird optimization algorithm (MBO) is applied to address this issue. Finally, a comparative experiment is carried out on a simulation example. The experimental results verify that incorporating the influence of workers with different proficiency on preparation time into the scheduling model can significantly optimize the total production completion time.

Computers & Operations ResearchVol. 184
Linköping University (SE), Xi’an University of Posts and Telecommunications (CN), University of Oulu (FI)
Natural Science Foundation of Shaanxi Provincial Department of Education, Key Research and Development Projects of Shaanxi Province
Decent work and economic growth
Openalex Percentile: Top 2%
Scheduling and Optimization Algorithms
8.70
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.