A chronological transmission expansion planning method and its comparison with stochastic planning

We propose a chronological transmission expansion planning (Chr-TEP) model that includes the temporal constraints of thermal power units and considers the time series of wind power, solar power, and load demands. The basic idea of this model is to obtain the optimal planning scheme by simulating the actual operation of the future power system. We adopt a cyclic modeling approach to solve the computational feasibility problem and address the issue of redundancy in the planning scheme through the maximum net load shifting technique. We compare the proposed model with a two-stage stochastic transmission expansion planning (Sto-TEP) model by observing changes in planning schemes, costs, and computational time with different time spans of scenarios or cycles and various clustering methods. Case studies are conducted on Garver’s 6-bus, IEEE 24-bus, and IEEE 118-bus systems. The results show that due to the simulation of future system operation and the consideration of constraints that better align with actual operating conditions, the Chr-TEP model generally plans more lines than the Sto-TEP model to ensure the feasibility of future operation. In addition, when considering temporal constraints in the Sto-TEP model, its computational time increases significantly, while the Chr-TEP model has an advantage in terms of computational efficiency.

Authors

Institutions

Publication Details

Journal
AIP Advances
Published
2025-08-01
DOI
https://doi.org/10.1063/5.0278917
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A chronological transmission expansion planning method and its comparison with stochastic planning

Peiguang Chen, Penghao Wang, Jianshe Cao, Jizhe Dong et al.
AIP Advances
Electric Power System Optimization
article

A chronological transmission expansion planning method and its comparison with stochastic planning

Peiguang Chen, Penghao Wang, Jianshe Cao, Jizhe Dong, Zihao Tian, Z. H. Zhao, Z. Wang
article en

Abstract

We propose a chronological transmission expansion planning (Chr-TEP) model that includes the temporal constraints of thermal power units and considers the time series of wind power, solar power, and load demands. The basic idea of this model is to obtain the optimal planning scheme by simulating the actual operation of the future power system. We adopt a cyclic modeling approach to solve the computational feasibility problem and address the issue of redundancy in the planning scheme through the maximum net load shifting technique. We compare the proposed model with a two-stage stochastic transmission expansion planning (Sto-TEP) model by observing changes in planning schemes, costs, and computational time with different time spans of scenarios or cycles and various clustering methods. Case studies are conducted on Garver’s 6-bus, IEEE 24-bus, and IEEE 118-bus systems. The results show that due to the simulation of future system operation and the consideration of constraints that better align with actual operating conditions, the Chr-TEP model generally plans more lines than the Sto-TEP model to ensure the feasibility of future operation. In addition, when considering temporal constraints in the Sto-TEP model, its computational time increases significantly, while the Chr-TEP model has an advantage in terms of computational efficiency.

AIP AdvancesVol. 15(8)
Jilin Electric Power Research Institute (China) (CN), Changchun University of Technology (CN)
Affordable and clean energy
Openalex Percentile: Top 81%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

A chronological transmission expansion planning method and its comparison with stochastic planning — Peiguang Chen, Penghao Wang, et al. · AIP Advances (2025) | TGRS Research Map | TGRS