Traditional production simulation models face significant challenges in solving optimization problems in real power grids due to high computational complexity, low efficiency, and insufficient accuracy, which pose difficulties for power system planning and operation. This paper focuses on reduction techniques for power production simulation models. In terms of scenario reduction, a temporal dimension reduction approach is employed to identify similar hours, days, and weeks within the 8,760 hours of a year. Multiple factors, including load, photovoltaic output, and wind power output, are comprehensively considered. An improved Euclidean distance calculation is incorporated to effectively reduce the original scenarios, significantly eliminating redundant scenarios and thereby accelerating production simulation. A production cost simulation based on real system data from a province demonstrates that the runtime after scenario reduction is only 0.002 times that of the original simulation. The results verify a substantial reduction in simulation time with minimal error, fully confirming the effectiveness of the proposed method.

Authors

Institutions

Publication Details

Published
2025-04-25
DOI
https://doi.org/10.1109/aaiee64965.2025.11100789
Primary Topic
Energy Load and Power Forecasting
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Novel Acceleration Technique for Power System Production Simulation Based on an Improved K-Means Algorithm

X. C. Meng, Long Zhao, Zixin Huang, Pei Zhang et al.
Energy Load and Power Forecasting
article

A Novel Acceleration Technique for Power System Production Simulation Based on an Improved K-Means Algorithm

X. C. Meng, Long Zhao, Zixin Huang, Pei Zhang, Huawei Li
article en

Abstract

Traditional production simulation models face significant challenges in solving optimization problems in real power grids due to high computational complexity, low efficiency, and insufficient accuracy, which pose difficulties for power system planning and operation. This paper focuses on reduction techniques for power production simulation models. In terms of scenario reduction, a temporal dimension reduction approach is employed to identify similar hours, days, and weeks within the 8,760 hours of a year. Multiple factors, including load, photovoltaic output, and wind power output, are comprehensively considered. An improved Euclidean distance calculation is incorporated to effectively reduce the original scenarios, significantly eliminating redundant scenarios and thereby accelerating production simulation. A production cost simulation based on real system data from a province demonstrates that the runtime after scenario reduction is only 0.002 times that of the original simulation. The results verify a substantial reduction in simulation time with minimal error, fully confirming the effectiveness of the proposed method.

Beijing Jiaotong University (CN), Economic Research Institute (BG)
Affordable and clean energy
Openalex Percentile: Top 81%
Energy Load and Power Forecasting
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.