STEEL COLUMN CONSTRUCTION METHOD IN WAREHOUSE DEVELOPMENT: A CASE STUDY IN CENGKARENG, WEST JAKARTA

This study discusses the implementation method of steel column construction in the warehouse in Cengkareng, West Jakarta. Steel columns are essential components in structural systems, responsible for carrying and transferring vertical and lateral loads. The construction process was carried out in several stages: preparation of shop drawings, installation of anchor bolts, erection of steel columns using a crane, vertical alignment checking with a water pass, and final stabilization through grouting. A Tadano TG-500M mobile crane with a 50-ton capacity was used to assist in lifting and installing the steel columns. Over 25 days, a total of 36 columns were successfully installed under careful coordination and field supervision. Grouting was applied to fill the gaps between the base plate and the concrete foundation, ensuring proper structural stability. This method proved to be efficient and aligned with standard construction practices. The study applied a descriptive qualitative approach through direct observation, documentation, and literature review. The results highlight the importance of systematic execution and the use of appropriate tools to ensure structural quality and safety. Moreover, this internship provided valuable hands-on experience in applying civil engineering theory to real-world construction projects

Authors

Publication Details

Journal
International Journal Science and Technology
Published
2024-11-28
DOI
https://doi.org/10.56127/ijst.v3i3.2214
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

STEEL COLUMN CONSTRUCTION METHOD IN WAREHOUSE DEVELOPMENT: A CASE STUDY IN CENGKARENG, WEST JAKARTA

Era Agita Kabdiyono, Komarudin Komarudin, Caca Januar, Ade Faizal Mukti
International Journal Science and Technology
Geotechnical and construction materials studies
article

STEEL COLUMN CONSTRUCTION METHOD IN WAREHOUSE DEVELOPMENT: A CASE STUDY IN CENGKARENG, WEST JAKARTA

Era Agita Kabdiyono, Komarudin Komarudin, Caca Januar, Ade Faizal Mukti
article en

Abstract

This study discusses the implementation method of steel column construction in the warehouse in Cengkareng, West Jakarta. Steel columns are essential components in structural systems, responsible for carrying and transferring vertical and lateral loads. The construction process was carried out in several stages: preparation of shop drawings, installation of anchor bolts, erection of steel columns using a crane, vertical alignment checking with a water pass, and final stabilization through grouting. A Tadano TG-500M mobile crane with a 50-ton capacity was used to assist in lifting and installing the steel columns. Over 25 days, a total of 36 columns were successfully installed under careful coordination and field supervision. Grouting was applied to fill the gaps between the base plate and the concrete foundation, ensuring proper structural stability. This method proved to be efficient and aligned with standard construction practices. The study applied a descriptive qualitative approach through direct observation, documentation, and literature review. The results highlight the importance of systematic execution and the use of appropriate tools to ensure structural quality and safety. Moreover, this internship provided valuable hands-on experience in applying civil engineering theory to real-world construction projects

International Journal Science and TechnologyVol. 3(3)
Sustainable cities and communities
Openalex Percentile: Top 66%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.