Development of a Mathematical Model for Multi-Location Training Center Timetabling Problem: A Case Study at the Yogyakarta Industrial Training Center

This study develops a mathematical model to address the multi-location training center timetabling problem, focusing on the Yogyakarta Industrial Training Center. Effective scheduling is crucial for optimizing resource utilization, minimizing conflicts, and ensuring equitable workload distribution among staff. The research identifies the challenges faced by conventional scheduling methods and proposes an Integer Programming approach to enhance scheduling efficiency. By analyzing historical workload data and conducting sensitivity analyses, the study demonstrates the model's effectiveness in achieving balanced workloads and reducing scheduling conflicts. The findings aim to improve operational efficiency and participant satisfaction in training programs.

Authors

Institutions

Publication Details

Journal
Asian Journal of Engineering Social and Health
Published
2025-08-09
DOI
https://doi.org/10.46799/ajesh.v4i8.619
Primary Topic
Scheduling and Timetabling Solutions
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Development of a Mathematical Model for Multi-Location Training Center Timetabling Problem: A Case Study at the Yogyakarta Industrial Training Center

Nur Aini Masruroh, Susilowati Susilowati
1 links
Asian Journal of Engineering Social and Health
Scheduling and Timetabling Solutions
article

Development of a Mathematical Model for Multi-Location Training Center Timetabling Problem: A Case Study at the Yogyakarta Industrial Training Center

Nur Aini Masruroh, Susilowati Susilowati
article en

Abstract

This study develops a mathematical model to address the multi-location training center timetabling problem, focusing on the Yogyakarta Industrial Training Center. Effective scheduling is crucial for optimizing resource utilization, minimizing conflicts, and ensuring equitable workload distribution among staff. The research identifies the challenges faced by conventional scheduling methods and proposes an Integer Programming approach to enhance scheduling efficiency. By analyzing historical workload data and conducting sensitivity analyses, the study demonstrates the model's effectiveness in achieving balanced workloads and reducing scheduling conflicts. The findings aim to improve operational efficiency and participant satisfaction in training programs.

Asian Journal of Engineering Social and HealthVol. 4(8)
Universitas Gadjah Mada (ID)
Decent work and economic growth
Openalex Percentile: Top 75%
Scheduling and Timetabling Solutions
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Development of a Mathematical Model for Multi-Location Training Center Timetabling Problem: A Case Study at the Yogyakarta Industrial Training Center — Nur Aini Masruroh, Susilowati Susilowati · Asian Journal of Engineering Social and Health (2025) | TGRS Research Map | TGRS