Evaluation of Sport Equipment Procurement Project Scheduling By Implementing Critical Path Method (CPM) and Project Evaluation and Review Technique (PERT)

The success or failure a project is largely determined by the planning and control of the project. This research was conducted on a sports equipment procurement project, especially gym equipment at a national company. The main problem with this project was the delay in completing this project for 33 days due to delays in the shipping department which caused delays in the process of subsequent activities. The purpose of this research is to find the optimal time that can be used to minimize delays in project completion. Optimizing working time is quite important for companies in working on projects to avoid wasting resources and losing the trust of their clients. The methods used in this study are the Critical Path Method (CPM) and the Program Evaluation and Review Technique (PERT). The results showed: the CPM method obtained 15 critical activities with a total duration of 239 days from the previous 306 days and the PERT method obtained 13 critical activities with a total duration of 258 days from the previous 306 days. Of the two methods, there is a difference that is 19 days faster with the CPM method. Thus the CPM method is used further for scheduling this project.

Authors

Publication Details

Journal
Greener Journal of Environment Management and Public Safety
Published
2025-07-30
DOI
https://doi.org/10.15580/gjemps.2025.1.032725059
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of Sport Equipment Procurement Project Scheduling By Implementing Critical Path Method (CPM) and Project Evaluation and Review Technique (PERT)

Popy Yuliarty, Atiek Ike Wijayanti, D Billy Klantika, Akhmad Fauzie Pane et al.
1 links
Greener Journal of Environment Management and Public Safety
Management and Optimization Techniques
article

Evaluation of Sport Equipment Procurement Project Scheduling By Implementing Critical Path Method (CPM) and Project Evaluation and Review Technique (PERT)

Popy Yuliarty, Atiek Ike Wijayanti, D Billy Klantika, Akhmad Fauzie Pane, Gusti Ayu Arwati
article en

Abstract

The success or failure a project is largely determined by the planning and control of the project. This research was conducted on a sports equipment procurement project, especially gym equipment at a national company. The main problem with this project was the delay in completing this project for 33 days due to delays in the shipping department which caused delays in the process of subsequent activities. The purpose of this research is to find the optimal time that can be used to minimize delays in project completion. Optimizing working time is quite important for companies in working on projects to avoid wasting resources and losing the trust of their clients. The methods used in this study are the Critical Path Method (CPM) and the Program Evaluation and Review Technique (PERT). The results showed: the CPM method obtained 15 critical activities with a total duration of 239 days from the previous 306 days and the PERT method obtained 13 critical activities with a total duration of 258 days from the previous 306 days. Of the two methods, there is a difference that is 19 days faster with the CPM method. Thus the CPM method is used further for scheduling this project.

Greener Journal of Environment Management and Public SafetyVol. 13(1)
Universitas Mercu Buana
Industry, innovation and infrastructure
Openalex Percentile: Top 69%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluation of Sport Equipment Procurement Project Scheduling By Implementing Critical Path Method (CPM) and Project Evaluation and Review Technique (PERT) — Popy Yuliarty, Atiek Ike Wijayanti, et al. · Greener Journal of Environment Management and Public Safety (2025) | TGRS Research Map | TGRS