Why do some projects prefabricate MEP while others do not?

Research Question: Why do some projects prefabricate mechanical, electrical, and plumbing (MEP) systems while others do not? Purpose: Most of the literature on MEP prefabrication is focused on its benefits, implying prefabrication is a rational choice, yet adoption rates remain low. The purpose of this study is to increase understanding in prefabrication decision-making. Research Method: Multiple case study research with a qualitative approach. Findings: The decision to prefabricate can result from a long lean implementation process or as an individual method to overcome a specific problem. Shortening cycle times and removing task dependencies to shorten the critical path are motivators for choosing to prefabricate. Additionally, cost savings during the project and improved productivity at the portfolio level are reasons for prefabricating. Tight schedules, late contractor involvement, and higher direct costs are reasons for not prefabricating, although cost- and schedule-related benefits are simultaneously acknowledged as benefits of prefabrication. Limitations: The study is limited by the low number of case projects and its emphasis on the Finnish market where MEP prefabrication is uncommon. Implications: The results support fact-based decision-making by highlighting reasons for prefabricating and the limitations of the evaluation methods. Additionally, required changes to production systems to realize the benefits of prefabrication are shown. Value for practitioners: The perceived benefits of prefabrication increase in certain circumstances, such as when takt production is utilized. The perceived benefits decrease when prefabrication is considered late in the process, is used instrumentally, or is isolated from other lean approaches. Keywords: prefabrication, choosing by advantages (CBA), Lean Construction Paper type: Full paper.

Authors

Publication Details

Journal
Lean Construction Journal
Published
2025-08-09
DOI
https://doi.org/10.60164/2a4ktfnel
Citations
1
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
1.01
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Why do some projects prefabricate MEP while others do not?

Otto Alhava, Olli Seppänen, Tuomas Valkonen, Jaakko Viitanen
1 citations
Lean Construction Journal
BIM and Construction Integration
1.01
article

Why do some projects prefabricate MEP while others do not?

Otto Alhava, Olli Seppänen, Tuomas Valkonen, Jaakko Viitanen
article en
1 citations

Abstract

Research Question: Why do some projects prefabricate mechanical, electrical, and plumbing (MEP) systems while others do not? Purpose: Most of the literature on MEP prefabrication is focused on its benefits, implying prefabrication is a rational choice, yet adoption rates remain low. The purpose of this study is to increase understanding in prefabrication decision-making. Research Method: Multiple case study research with a qualitative approach. Findings: The decision to prefabricate can result from a long lean implementation process or as an individual method to overcome a specific problem. Shortening cycle times and removing task dependencies to shorten the critical path are motivators for choosing to prefabricate. Additionally, cost savings during the project and improved productivity at the portfolio level are reasons for prefabricating. Tight schedules, late contractor involvement, and higher direct costs are reasons for not prefabricating, although cost- and schedule-related benefits are simultaneously acknowledged as benefits of prefabrication. Limitations: The study is limited by the low number of case projects and its emphasis on the Finnish market where MEP prefabrication is uncommon. Implications: The results support fact-based decision-making by highlighting reasons for prefabricating and the limitations of the evaluation methods. Additionally, required changes to production systems to realize the benefits of prefabrication are shown. Value for practitioners: The perceived benefits of prefabrication increase in certain circumstances, such as when takt production is utilized. The perceived benefits decrease when prefabrication is considered late in the process, is used instrumentally, or is isolated from other lean approaches. Keywords: prefabrication, choosing by advantages (CBA), Lean Construction Paper type: Full paper.

Lean Construction Journal
Decent work and economic growth
Openalex Percentile: Top 22%
BIM and Construction Integration
1.01
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Why do some projects prefabricate MEP while others do not? — Otto Alhava, Olli Seppänen, et al. · Lean Construction Journal (2025) | TGRS Research Map | TGRS