Aradel Holdings’ Wells, Reservoir, and Facility Management (WRFM) Journey to Maximizing Asset Value

Abstract The traditional approach to optimizing production and recovery in oil and gas asset management often relies on disciplines working in a relay-like approach, starting with petroleum engineering team focusing on the reservoir value optimization management, followed by well engineering rig or rig-less interventions, and finally production operations and process engineering looking for opportunities to enhance production via process optimization, facilities debottlenecking and other surface engineering activities. This approach has three major gaps, viz: lack of individual discipline integration from the reservoir to the sales point, lack of a joint key performance indicator for continuous improvement in the integrated production system optimization, and lack of ownership and accountability of the outcome from individual disciplines' inputs. Aradel embarked on a journey to close these gaps by institutionalizing Wells Reservoir and Facility Management (WRFM), which provides a structured and integrated approach that focused on maximizing the "4Rs": Rate, Recovery, Return on Investment (ROI), and Regulatory Compliance under the framework of a ring fenced integrated WRFM team. SHELL introduced the WRFM approach and it focuses on the LEAN process of continuous improvement called the WRFM continuous Value Loop, which acts like a production conveyor belt that involves the following activities: integrated understanding of the physical asset, data acquisition, data management, data interpretation, modelling, review meetings to generation, evaluation of options making decision, intervention planning/executions and after action review to optimize production and reserves. Aradel's WRFM institutionalization journey has five (5) stages: stage-1: training on WRFM processes and practices, stage 2: conducting health checks on the asset and people to identify gaps to WRFM minimum standards, stage 3: simultaneously closing the gaps to attain WRFM minimum standards (tier-3) and institutionalization of WRFM process and practice to optimize production and reserves, and stage-4:implementation of digital oilfield project (DOF) for real-time surveillance, analytics and production optimization.

Authors

Publication Details

Journal
SPE Nigeria Annual International Conference and Exhibition
Published
2025-08-04
DOI
https://doi.org/10.2118/228816-ms
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Aradel Holdings’ Wells, Reservoir, and Facility Management (WRFM) Journey to Maximizing Asset Value

Collins Alaka, Stephen Nwala, Adeola Asamu
SPE Nigeria Annual International Conference and Exhibition
Reservoir Engineering and Simulation Methods
article

Aradel Holdings’ Wells, Reservoir, and Facility Management (WRFM) Journey to Maximizing Asset Value

Collins Alaka, Stephen Nwala, Adeola Asamu
article en

Abstract

Abstract The traditional approach to optimizing production and recovery in oil and gas asset management often relies on disciplines working in a relay-like approach, starting with petroleum engineering team focusing on the reservoir value optimization management, followed by well engineering rig or rig-less interventions, and finally production operations and process engineering looking for opportunities to enhance production via process optimization, facilities debottlenecking and other surface engineering activities. This approach has three major gaps, viz: lack of individual discipline integration from the reservoir to the sales point, lack of a joint key performance indicator for continuous improvement in the integrated production system optimization, and lack of ownership and accountability of the outcome from individual disciplines' inputs. Aradel embarked on a journey to close these gaps by institutionalizing Wells Reservoir and Facility Management (WRFM), which provides a structured and integrated approach that focused on maximizing the "4Rs": Rate, Recovery, Return on Investment (ROI), and Regulatory Compliance under the framework of a ring fenced integrated WRFM team. SHELL introduced the WRFM approach and it focuses on the LEAN process of continuous improvement called the WRFM continuous Value Loop, which acts like a production conveyor belt that involves the following activities: integrated understanding of the physical asset, data acquisition, data management, data interpretation, modelling, review meetings to generation, evaluation of options making decision, intervention planning/executions and after action review to optimize production and reserves. Aradel's WRFM institutionalization journey has five (5) stages: stage-1: training on WRFM processes and practices, stage 2: conducting health checks on the asset and people to identify gaps to WRFM minimum standards, stage 3: simultaneously closing the gaps to attain WRFM minimum standards (tier-3) and institutionalization of WRFM process and practice to optimize production and reserves, and stage-4:implementation of digital oilfield project (DOF) for real-time surveillance, analytics and production optimization.

SPE Nigeria Annual International Conference and Exhibition
Openalex Percentile: Top 53%
Reservoir Engineering and Simulation Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.