Optimasi Desain Tubuh Bendung Boreng di Sungai Asem Kabupaten Lumajang

The background of this research is the severe damage to the Boreng Dam in Lumajang Regency due to natural disasters, which disrupted irrigation and flood control functions. Significant differences between the 2017 and 2024 designs, both in terms of cost and structure, necessitate further analysis to determine the optimal design. The objective of this study is to compare the two designs in terms of stability, seepage, and cost efficiency, and to perform optimization to obtain the best solution. The research method starts from analyzing the difference between the 2017 design results and the 2024 design, then a calculation will be made on the bearing capacity of the pillar foundation. Using the Plaxis application, finite element method modeling was carried out on the stability of the weir body and examination of seepage. From the results of the study, the large price difference from the 2017 and 2024 designs is due to the difference in the type of weir markers that affect the volume of concrete, the use of K-300 concrete for the 2017 design is only found in the landmark blanket to the olak pond only, while the 2024 design also uses it on the upstream floor structure, then for the 2017 design does not use concrete pile foundations as many as 245 points like the 2024 design. The stability of the weir in the 2017 and 2014 designs both show a good level of safety with a safety factor value above 1.5 so that there is no need for additional reinforcement, but in the 2017 design it does not meet the lane seepage requirement with a minimum value of 8.5 for bare sandy soil, so optimization of the 2024 design is carried out with 2 modified models, namely reducing the depth of the pile from the original 6 meters to 3 meters and changing the dimensions to the original size of 40 x 40 cm to 25 x 25 cm. Material cost analysis for modification 1 showed a cost efficiency over the initial design of Rp. 259,554,225.00, while for modification 2 there was an efficiency of Rp. 884,561,475.00. The implication of this study is a recommendation to implement the 2024 design modification with 3-meter piles and dimensions of 25 x 25 cm as a safe and economical optimal solution.

Authors

Institutions

Publication Details

Journal
Jurnal Impresi Indonesia
Published
2025-07-25
DOI
https://doi.org/10.58344/jii.v4i7.6868
Primary Topic
Coastal Management and Development
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Optimasi Desain Tubuh Bendung Boreng di Sungai Asem Kabupaten Lumajang

Yudhi Lastiasih, Lutfianto Cahya Rachmadan
Jurnal Impresi Indonesia
Coastal Management and Development
article

Optimasi Desain Tubuh Bendung Boreng di Sungai Asem Kabupaten Lumajang

Yudhi Lastiasih, Lutfianto Cahya Rachmadan
article en

Abstract

The background of this research is the severe damage to the Boreng Dam in Lumajang Regency due to natural disasters, which disrupted irrigation and flood control functions. Significant differences between the 2017 and 2024 designs, both in terms of cost and structure, necessitate further analysis to determine the optimal design. The objective of this study is to compare the two designs in terms of stability, seepage, and cost efficiency, and to perform optimization to obtain the best solution. The research method starts from analyzing the difference between the 2017 design results and the 2024 design, then a calculation will be made on the bearing capacity of the pillar foundation. Using the Plaxis application, finite element method modeling was carried out on the stability of the weir body and examination of seepage. From the results of the study, the large price difference from the 2017 and 2024 designs is due to the difference in the type of weir markers that affect the volume of concrete, the use of K-300 concrete for the 2017 design is only found in the landmark blanket to the olak pond only, while the 2024 design also uses it on the upstream floor structure, then for the 2017 design does not use concrete pile foundations as many as 245 points like the 2024 design. The stability of the weir in the 2017 and 2014 designs both show a good level of safety with a safety factor value above 1.5 so that there is no need for additional reinforcement, but in the 2017 design it does not meet the lane seepage requirement with a minimum value of 8.5 for bare sandy soil, so optimization of the 2024 design is carried out with 2 modified models, namely reducing the depth of the pile from the original 6 meters to 3 meters and changing the dimensions to the original size of 40 x 40 cm to 25 x 25 cm. Material cost analysis for modification 1 showed a cost efficiency over the initial design of Rp. 259,554,225.00, while for modification 2 there was an efficiency of Rp. 884,561,475.00. The implication of this study is a recommendation to implement the 2024 design modification with 3-meter piles and dimensions of 25 x 25 cm as a safe and economical optimal solution.

Jurnal Impresi IndonesiaVol. 4(7)
Sepuluh Nopember Institute of Technology (ID)
Climate action
Openalex Percentile: Top 71%
Coastal Management and Development
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.