Smart Construction Site Management System Based on BIM

Zhuhai Port Project of Hong Kong-Zhuhai-Macao Bridge is the key node of "Super Project". During the construction of 1.07 million square meters artificial island, it faced complicated supervision and management problems. Huagong Supervision takes BIM technology as the core driving force to create a model of smart site management. In terms of technical application, using Revit software to create a three-dimensional model and realize the deepening design of special-shaped structures, the amount of on-site cutting is reduced by 37% and the construction period is shortened by 18 days; With the help of 4D dynamic monitoring system, the accuracy of construction progress control is improved by 80%; By means of stress simulation and stress monitoring, the safety risk of high formwork was pre-controlled, and the rectification rate of hidden dangers decreased from 62% to 9%. From the perspective of management efficiency, the multi-party collaborative platform shortens the design change cycle by 72%, the "BIM+measured quantity" method improves the qualified rate of concrete components to 98%, and the completed BIM model saves more than 8 million yuan for operation and maintenance. Aiming at the problem of insufficient construction capacity and inconsistent data standards, it is solved by "BIM+QR code" technology and compiling interactive standards. Practice has proved that BIM technology has formed a "data-driven collaborative governance" model by integrating the data of design, construction and supervision.

Publication Details

Journal
Information Systems and Economics
Published
2025-01-01
DOI
https://doi.org/10.23977/infse.2025.060209
Primary Topic
Wireless Sensor Networks and IoT
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Smart Construction Site Management System Based on BIM

Information Systems and Economics
Wireless Sensor Networks and IoT
article

Smart Construction Site Management System Based on BIM

article en

Abstract

Zhuhai Port Project of Hong Kong-Zhuhai-Macao Bridge is the key node of "Super Project". During the construction of 1.07 million square meters artificial island, it faced complicated supervision and management problems. Huagong Supervision takes BIM technology as the core driving force to create a model of smart site management. In terms of technical application, using Revit software to create a three-dimensional model and realize the deepening design of special-shaped structures, the amount of on-site cutting is reduced by 37% and the construction period is shortened by 18 days; With the help of 4D dynamic monitoring system, the accuracy of construction progress control is improved by 80%; By means of stress simulation and stress monitoring, the safety risk of high formwork was pre-controlled, and the rectification rate of hidden dangers decreased from 62% to 9%. From the perspective of management efficiency, the multi-party collaborative platform shortens the design change cycle by 72%, the "BIM+measured quantity" method improves the qualified rate of concrete components to 98%, and the completed BIM model saves more than 8 million yuan for operation and maintenance. Aiming at the problem of insufficient construction capacity and inconsistent data standards, it is solved by "BIM+QR code" technology and compiling interactive standards. Practice has proved that BIM technology has formed a "data-driven collaborative governance" model by integrating the data of design, construction and supervision.

Information Systems and EconomicsVol. 6(2)
Industry, innovation and infrastructure
Openalex Percentile: Top 75%
Wireless Sensor Networks and IoT
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.