This study discusses long-term electricity load forecasting at the end of the year using a linear regression method, applied to the Glugur Substation in Medan. Historical load data from 2021 to 2024 is used as the basis for calculations to forecast electricity loads until the end of 2026. The forecasting process is carried out by modeling the relationship between the increase in time to peak load and monthly energy, using a linear regression approach. The forecasting results show a stable and consistent load increase trend. Model accuracy evaluation is carried out using MAPE, R², MAE, and RMSE metrics. The lowest MAPE value is obtained at 1.37% at the Selayang Substation, while the Glugur Substation has a MAPE value of 2.43%, indicating a good level of accuracy for long-term forecasting. This research contributes to supporting the planning of a more reliable and efficient electricity distribution system.

Authors

Institutions

Publication Details

Journal
Proceeding of International Conference on Science and Technology UISU.
Published
2025-08-10
DOI
https://doi.org/10.30743/frxcx086
Citations
1
Primary Topic
Energy Load and Power Forecasting
Type
article
Field-Weighted Citation Impact
0.73
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Long-Term Load Forecasting At The End Of The Year Using The Linear Regression Method

Robinson Harahap, Samuel Patra Purba
1 citations
Proceeding of International Conference on Science and Technology UISU.
Energy Load and Power Forecasting
0.73
article

Long-Term Load Forecasting At The End Of The Year Using The Linear Regression Method

Robinson Harahap, Samuel Patra Purba
article en
1 citations

Abstract

This study discusses long-term electricity load forecasting at the end of the year using a linear regression method, applied to the Glugur Substation in Medan. Historical load data from 2021 to 2024 is used as the basis for calculations to forecast electricity loads until the end of 2026. The forecasting process is carried out by modeling the relationship between the increase in time to peak load and monthly energy, using a linear regression approach. The forecasting results show a stable and consistent load increase trend. Model accuracy evaluation is carried out using MAPE, R², MAE, and RMSE metrics. The lowest MAPE value is obtained at 1.37% at the Selayang Substation, while the Glugur Substation has a MAPE value of 2.43%, indicating a good level of accuracy for long-term forecasting. This research contributes to supporting the planning of a more reliable and efficient electricity distribution system.

Proceeding of International Conference on Science and Technology UISU.
Universitas Sumatera Utara (ID)
Openalex Percentile: Top 25%
Energy Load and Power Forecasting
0.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.