Helium Infrastructure of the Cryogenic Complex for the Collider: Results of Preparation for the Technological Session

The technological session of the Collider ring is scheduled for early 2025. The session program includes cooling magnets to operating temperature of 4.5 K, testing the magnetic-cryostat system for leaks, testing with the operating current into the magnets, and checking the operability of the correctors. New equipment of the cryogenic complex will be used to cool the magnets: refrigerators RSG Nos. 2 and 3, helium liquefier OG-1000, cold helium storage KTsG-40/0.5 and an extensive manifold of cryogenic pipelines. Results of testing new cryogenic complex facilities are presented and technological solutions that will provide the optimal operating mode of the accelerator equipment at helium temperatures are described.

Authors

Institutions

Publication Details

Journal
Physics of Particles and Nuclei Letters
Published
2025-08-01
DOI
https://doi.org/10.1134/s1547477125700438
Primary Topic
Superconducting Materials and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Helium Infrastructure of the Cryogenic Complex for the Collider: Results of Preparation for the Technological Session

Yu. A. Mitrofanova, D. S. Shvidkiy, Andrei V. Konstantinov, S. V. Gudkov et al.
Physics of Particles and Nuclei Letters
Superconducting Materials and Applications
article

Helium Infrastructure of the Cryogenic Complex for the Collider: Results of Preparation for the Technological Session

Yu. A. Mitrofanova, D. S. Shvidkiy, Andrei V. Konstantinov, S. V. Gudkov, A. E. Emelyanov, N. N. Agapov, T. G. Zhironkina, A. A. Bazvanov
article en

Abstract

The technological session of the Collider ring is scheduled for early 2025. The session program includes cooling magnets to operating temperature of 4.5 K, testing the magnetic-cryostat system for leaks, testing with the operating current into the magnets, and checking the operability of the correctors. New equipment of the cryogenic complex will be used to cool the magnets: refrigerators RSG Nos. 2 and 3, helium liquefier OG-1000, cold helium storage KTsG-40/0.5 and an extensive manifold of cryogenic pipelines. Results of testing new cryogenic complex facilities are presented and technological solutions that will provide the optimal operating mode of the accelerator equipment at helium temperatures are described.

Physics of Particles and Nuclei LettersVol. 22(4)
Joint Institute for Nuclear Research (RU), Dubna State University (RU)
Industry, innovation and infrastructure
Openalex Percentile: Top 81%
Superconducting Materials and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Helium Infrastructure of the Cryogenic Complex for the Collider: Results of Preparation for the Technological Session — Yu. A. Mitrofanova, D. S. Shvidkiy, et al. · Physics of Particles and Nuclei Letters (2025) | TGRS Research Map | TGRS