Commissioning Status of the Technical Equipment at the Compressor Station CS 2 of the Veksler Baldin Laboratory of High Energy Physics

Commissioning of the new superconducting accelerators (Booster and Collider) required more than doubling the cooling capacity of the VBLHEP’s cryogenic system. Two new Kaskad-110/30 screw helium compressors Nos. 3 and 4 have been installed at the compressor station CS No. 2 to supply compressed helium to the liquefier OG-1000 and satellite refrigerators RSG-2000/4.5 Nos. 1–3. In addition, a new closed cycle nitrogen cryogenic system of the accelerator NICA complex is currently under construction, which is intended for the production of liquid nitrogen, recondensation of nitrogen vapors, and supply of nitrogen of the consumers. Two Samsung SM5000 turbocompressors Nos. 1 and 2 and an Aerocom 2-179/18 turbocompressor will be used to supply compressed nitrogen to the cryogenic facilities.

Authors

Institutions

Publication Details

Journal
Physics of Particles and Nuclei Letters
Published
2025-08-01
DOI
https://doi.org/10.1134/s1547477125700694
Primary Topic
Superconducting Materials and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Commissioning Status of the Technical Equipment at the Compressor Station CS 2 of the Veksler Baldin Laboratory of High Energy Physics

Yu. A. Mitrofanova, G. G. Stiforov, Andrey Zharkov, D. S. Shvidkiy et al.
Physics of Particles and Nuclei Letters
Superconducting Materials and Applications
article

Commissioning Status of the Technical Equipment at the Compressor Station CS 2 of the Veksler Baldin Laboratory of High Energy Physics

Yu. A. Mitrofanova, G. G. Stiforov, Andrey Zharkov, D. S. Shvidkiy, Yu Kryukov, Andrei V. Konstantinov, А. О. Колесников, N. N. Agapov
article en

Abstract

Commissioning of the new superconducting accelerators (Booster and Collider) required more than doubling the cooling capacity of the VBLHEP’s cryogenic system. Two new Kaskad-110/30 screw helium compressors Nos. 3 and 4 have been installed at the compressor station CS No. 2 to supply compressed helium to the liquefier OG-1000 and satellite refrigerators RSG-2000/4.5 Nos. 1–3. In addition, a new closed cycle nitrogen cryogenic system of the accelerator NICA complex is currently under construction, which is intended for the production of liquid nitrogen, recondensation of nitrogen vapors, and supply of nitrogen of the consumers. Two Samsung SM5000 turbocompressors Nos. 1 and 2 and an Aerocom 2-179/18 turbocompressor will be used to supply compressed nitrogen to the cryogenic facilities.

Physics of Particles and Nuclei LettersVol. 22(4)
Joint Institute for Nuclear Research (RU)
Affordable and clean energy
Openalex Percentile: Top 81%
Superconducting Materials and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.