Riserless Light Well Intervention Multi-Well Hydraulic Stimulation Campaign via Subsea Production Manifold Access Point in Deepwater Gulf of America

Abstract Hydraulic stimulation intervention cost reduction initiatives over the past four years have allowed more frequent economical deepwater interventions in the Gulf of America (GoA). In February 2025, a five well hydraulic stimulation campaign was launched, which significantly reduced intervention costs by accessing all five wells through a single access point on the subsea production manifold. The project was a GoA deepwater hydraulic stimulation intervention first due to utilizing Thermoplastic Composite Pipe (TCP) jumpers and elimination of the intervention package stack hopping constraint. Simultaneous Operations (SIMOPS) restrictions between a Mobile Offshore Drilling Unit (MODU) conducting a multi-year program at the drill center prevented vertical access to the wells by the Riserless Light Well Intervention (RLWI) vessel. However, the procurement and installation of High Collapse Resistant (HCR) Well Service Jumpers (WSJ) made of TCP and additional subsea hardware provided sufficient separation between the vessel thus alleviating the SIMOPS restrictions. bp worked with two main subsea vendors for procurement, fabrication, and modifications of the subsea hardware system. Furthermore, to gain access at a single point on the subsea production manifold hub, a modified Long Term Intervention Pressure Cap (LTIPC) was installed at an unutilized slot on the production manifold to provide pump through capability. The LTIPC contained two gate valves which provided dual barrier isolation to the environment. A construction vessel was used to install and commission the WSJ and associated subsea hardware. This equipment preinstallation allowed the RLWI vessel to mobilize directly to the predetermined asset offset location, deploy the Riserless Hydraulic Pumping Package (RHPP), connect Coiled Tubing (CT) downlines, and begin subsea RHPP regulatory testing. The execution of all five wells was successful with no recorded non-productive time attributed to the installed subsea equipment during the 14 day campaign. The functionality of a designated single subsea production manifold tie-in point proved that future field-specific hydraulic interventions are feasible while the MODU is over the asset drill center without compromising rig schedules and cost.

Authors

Institutions

Publication Details

Published
2025-08-12
DOI
https://doi.org/10.2118/228272-ms
Primary Topic
Oil and Gas Production Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Riserless Light Well Intervention Multi-Well Hydraulic Stimulation Campaign via Subsea Production Manifold Access Point in Deepwater Gulf of America

Carl E. Mathisen, Lawrence Ramnath, E. Charles, Autumn Khalily
Oil and Gas Production Techniques
article

Riserless Light Well Intervention Multi-Well Hydraulic Stimulation Campaign via Subsea Production Manifold Access Point in Deepwater Gulf of America

Carl E. Mathisen, Lawrence Ramnath, E. Charles, Autumn Khalily
article en

Abstract

Abstract Hydraulic stimulation intervention cost reduction initiatives over the past four years have allowed more frequent economical deepwater interventions in the Gulf of America (GoA). In February 2025, a five well hydraulic stimulation campaign was launched, which significantly reduced intervention costs by accessing all five wells through a single access point on the subsea production manifold. The project was a GoA deepwater hydraulic stimulation intervention first due to utilizing Thermoplastic Composite Pipe (TCP) jumpers and elimination of the intervention package stack hopping constraint. Simultaneous Operations (SIMOPS) restrictions between a Mobile Offshore Drilling Unit (MODU) conducting a multi-year program at the drill center prevented vertical access to the wells by the Riserless Light Well Intervention (RLWI) vessel. However, the procurement and installation of High Collapse Resistant (HCR) Well Service Jumpers (WSJ) made of TCP and additional subsea hardware provided sufficient separation between the vessel thus alleviating the SIMOPS restrictions. bp worked with two main subsea vendors for procurement, fabrication, and modifications of the subsea hardware system. Furthermore, to gain access at a single point on the subsea production manifold hub, a modified Long Term Intervention Pressure Cap (LTIPC) was installed at an unutilized slot on the production manifold to provide pump through capability. The LTIPC contained two gate valves which provided dual barrier isolation to the environment. A construction vessel was used to install and commission the WSJ and associated subsea hardware. This equipment preinstallation allowed the RLWI vessel to mobilize directly to the predetermined asset offset location, deploy the Riserless Hydraulic Pumping Package (RHPP), connect Coiled Tubing (CT) downlines, and begin subsea RHPP regulatory testing. The execution of all five wells was successful with no recorded non-productive time attributed to the installed subsea equipment during the 14 day campaign. The functionality of a designated single subsea production manifold tie-in point proved that future field-specific hydraulic interventions are feasible while the MODU is over the asset drill center without compromising rig schedules and cost.

BP (United States) (US)
Life below water
Openalex Percentile: Top 75%
Oil and Gas Production Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.