Bi-Level Collaborative Operation Method for On-Grid PV-Storage Hybrid System Ensuring Profitability

With the increasing development of hybrid renewable energy technology, a series of hybrid renewable energy projects are emerging, which are carried out by the cooperation of load enterprises and renewable energy investment entities. However, the investor aims to reach a specific rate of return by selling energy to the demand side at a certain price, while the industrial load aims to save its electricity bill by using renewable energy generation and the arbitrage behaviors of BESS. This conflict of interest between investor and consumer is formulated as a Stackelberg problem in this paper. A novel bi-level collaborative operation method for an on-grid PV-storage-load hybrid system is proposed, considering the internal rate of return of system construction. The nonconvex constraints are relaxed, and a two-stage algorithm is designed to solve the proposed bi-level problem. Numerical case studies based on real power generation from northwest China are carried out to verify the effectiveness of the proposed model.

Authors

Institutions

Publication Details

Published
2025-05-23
DOI
https://doi.org/10.1109/netps65392.2025.11102079
Primary Topic
Hybrid Renewable Energy Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Bi-Level Collaborative Operation Method for On-Grid PV-Storage Hybrid System Ensuring Profitability

Bingqing Xia, Wei Chen, Zhaohui Shi, Yanbo Jia et al.
Hybrid Renewable Energy Systems
article

Bi-Level Collaborative Operation Method for On-Grid PV-Storage Hybrid System Ensuring Profitability

Bingqing Xia, Wei Chen, Zhaohui Shi, Yanbo Jia, Lei Zhang
article en

Abstract

With the increasing development of hybrid renewable energy technology, a series of hybrid renewable energy projects are emerging, which are carried out by the cooperation of load enterprises and renewable energy investment entities. However, the investor aims to reach a specific rate of return by selling energy to the demand side at a certain price, while the industrial load aims to save its electricity bill by using renewable energy generation and the arbitrage behaviors of BESS. This conflict of interest between investor and consumer is formulated as a Stackelberg problem in this paper. A novel bi-level collaborative operation method for an on-grid PV-storage-load hybrid system is proposed, considering the internal rate of return of system construction. The nonconvex constraints are relaxed, and a two-stage algorithm is designed to solve the proposed bi-level problem. Numerical case studies based on real power generation from northwest China are carried out to verify the effectiveness of the proposed model.

PowerChina (China) (CN), Powerchina Huadong Engineering Corporation (China) (CN)
Openalex Percentile: Top 78%
Hybrid Renewable Energy Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.