The Columbia-Wrightsville Bridge That Endured
The concrete arch design, despite being built quickly, has helped Pennsylvanians travel longer than any other structure on-site.
Authors
- Leslie Nemo
Institutions
- ING Direct (US)
Publication Details
- Journal
- Civil engineering
- Published
- 2025-03-01
- DOI
- https://doi.org/10.1061/ciegag.0001765
- Primary Topic
- Structural Engineering and Vibration Analysis
- Type
- article
- Field-Weighted Citation Impact
- 0.00