REVIEW OF THE LEVEL OF UNDERSTANDING OF CONSTRUCTION WORK CONTRACTS AT PT. DAMARMAS CONTRACTOR

The occurrence of discrepancies in both the time and cost of construction projects can be caused by the lack of understanding of the parties involved in a construction work contract. Therefore, this research reviews the extent to which the parties to the construction work contract understand the clauses contained in the agreed construction work contract so that improvements can be made to carry out construction work contracts in subsequent construction projects.The purpose of the research is to find out to what extent the parties to the construction work contract can understand and implement the contents of the clauses contained in the construction work contract, so that they can make improvements to the implementation of construction work contracts in subsequent projects. The research method applied a descriptive method that uses direct interviews with research respondents.Based on the results of the research and discussion, it can be concluded that the parties to the construction work contract have understood and implemented the contents or clauses in the construction contract quite well but still need to be given an increased understanding of the mechanisms to carry out additional work and procedures related to the potential of extra time and cost of completing the construction project as a whole

Authors

Institutions

Publication Details

Journal
International Journal of Engineering Technologies and Management Research
Published
2025-08-12
DOI
https://doi.org/10.29121/ijetmr.v12.i8.2025.1653
Primary Topic
Urban Transport Systems Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

REVIEW OF THE LEVEL OF UNDERSTANDING OF CONSTRUCTION WORK CONTRACTS AT PT. DAMARMAS CONTRACTOR

Taufik Dwi Laksono, Dwi Sri Wiyanti
International Journal of Engineering Technologies and Management Research
Urban Transport Systems Analysis
article

REVIEW OF THE LEVEL OF UNDERSTANDING OF CONSTRUCTION WORK CONTRACTS AT PT. DAMARMAS CONTRACTOR

Taufik Dwi Laksono, Dwi Sri Wiyanti
article en

Abstract

The occurrence of discrepancies in both the time and cost of construction projects can be caused by the lack of understanding of the parties involved in a construction work contract. Therefore, this research reviews the extent to which the parties to the construction work contract understand the clauses contained in the agreed construction work contract so that improvements can be made to carry out construction work contracts in subsequent construction projects.The purpose of the research is to find out to what extent the parties to the construction work contract can understand and implement the contents of the clauses contained in the construction work contract, so that they can make improvements to the implementation of construction work contracts in subsequent projects. The research method applied a descriptive method that uses direct interviews with research respondents.Based on the results of the research and discussion, it can be concluded that the parties to the construction work contract have understood and implemented the contents or clauses in the construction contract quite well but still need to be given an increased understanding of the mechanisms to carry out additional work and procedures related to the potential of extra time and cost of completing the construction project as a whole

International Journal of Engineering Technologies and Management ResearchVol. 12(8)
Universitas Wijayakusuma Purwokerto (ID)
Openalex Percentile: Top 78%
Urban Transport Systems Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

REVIEW OF THE LEVEL OF UNDERSTANDING OF CONSTRUCTION WORK CONTRACTS AT PT. DAMARMAS CONTRACTOR — Taufik Dwi Laksono, Dwi Sri Wiyanti · International Journal of Engineering Technologies and Management Research (2025) | TGRS Research Map | TGRS