Application of Dynamic Replacement Soil Improvement Method to an Early Site Preparation Works Project in Saudi Arabia

Early site preparation works were required for a big capital project site located close to the Arabian Gulf Coast in the Eastern Province of Saudi Arabia. The ground conditions at the delineated area at site comprise 5 to 6 m thick of very loose Silty Sand interbedded with Silt & Soft Clay, overlying medium dense to very dense silty Sand. The scope of the early site works within the delineated area (approx. 1.1 million sq.m) on site was limited to soil improvement by applying the Dynamic Replacement (DR) soil improvement due to the very high fines content of upper soils and the unsuitability of utilizing conventional mechanical compaction, e.g. Dynamic Compaction (DC) & Rapid Dynamic Compaction (RDC). The DR method was utilized to reduce the compressibility, improve the density and increase the bearing capacity of the underlying soils prior to the application of approx. 2 m thick fill across the site to reach desired final grade level. Pre and Post CPTs were undertaken at the site for initial calibration trial and post quality assurance of the main DR works. The results of the post quality tests show significant improvement of the soil, and the acceptance criteria of 100 kPa for a footing of 3 m by 3 m set for the project were met.

Authors

Publication Details

Journal
World Journal of Engineering and Technology
Published
2025-01-01
DOI
https://doi.org/10.4236/wjet.2025.133036
Primary Topic
Geotechnical Engineering and Soil Stabilization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Application of Dynamic Replacement Soil Improvement Method to an Early Site Preparation Works Project in Saudi Arabia

Abiola Ojo, Ahmed Bu-Ali
World Journal of Engineering and Technology
Geotechnical Engineering and Soil Stabilization
article

Application of Dynamic Replacement Soil Improvement Method to an Early Site Preparation Works Project in Saudi Arabia

Abiola Ojo, Ahmed Bu-Ali
article en

Abstract

Early site preparation works were required for a big capital project site located close to the Arabian Gulf Coast in the Eastern Province of Saudi Arabia. The ground conditions at the delineated area at site comprise 5 to 6 m thick of very loose Silty Sand interbedded with Silt & Soft Clay, overlying medium dense to very dense silty Sand. The scope of the early site works within the delineated area (approx. 1.1 million sq.m) on site was limited to soil improvement by applying the Dynamic Replacement (DR) soil improvement due to the very high fines content of upper soils and the unsuitability of utilizing conventional mechanical compaction, e.g. Dynamic Compaction (DC) & Rapid Dynamic Compaction (RDC). The DR method was utilized to reduce the compressibility, improve the density and increase the bearing capacity of the underlying soils prior to the application of approx. 2 m thick fill across the site to reach desired final grade level. Pre and Post CPTs were undertaken at the site for initial calibration trial and post quality assurance of the main DR works. The results of the post quality tests show significant improvement of the soil, and the acceptance criteria of 100 kPa for a footing of 3 m by 3 m set for the project were met.

World Journal of Engineering and TechnologyVol. 13(03)
Zero hunger
Openalex Percentile: Top 78%
Geotechnical Engineering and Soil Stabilization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.