Safety analysis of hoisting points and lifting platform supports in large-span steel structure corridors
Abstract The load conditions of lifting points during the hoisting process of large-span corridors significantly impact construction safety. This study focuses on the brackets and supports involved in the hoisting process of the upper corridor in Zone C of the CCCC South Headquarters. Considering the most unfavorable conditions during lifting, the stress and deformation of the brackets and support structures were analyzed using the MIDAS/FEA finite element analysis software. The results indicate that the maximum deformation of the upper lifting point bracket is 1.77 mm, with a maximum nodal stress of 239.4 MPa, while the lower lifting point bracket experiences a maximum deformation of 1.49 mm and a maximum nodal stress of 201.4 MPa. Both meet the strength and stiffness requirements. The maximum deformation of the lifting platform support structure is 1.35 mm, with a maximum stress of 56.49 N/mm 2 and a peak stress ratio of 0.23, all conforming to design specifications. This study provides a valuable reference for similar steel corridor hoisting projects.
Authors
- Lican Liao
- Pengcheng Xie (ORCID: https://orcid.org/0000-0003-3449-0514)
- Xueqian Lou
- Jing‐Feng Li (ORCID: https://orcid.org/0000-0002-0185-0512)
- Pengfei Huang (ORCID: https://orcid.org/0000-0002-9589-9965)
- Yan Meng
Institutions
- Key Laboratory of Guangdong Province (CN)
Publication Details
- Journal
- Journal of Physics Conference Series
- Published
- 2025-08-01
- DOI
- https://doi.org/10.1088/1742-6596/3068/1/012147
- Primary Topic
- Engineering Structural Analysis Methods
- Type
- article
- Field-Weighted Citation Impact
- 0.00