Penentuan Waktu Baku untuk Proses Pengelolaan Limbah B3 di PT XYZ

PT XYZ is a manufacturing company in the automotive sector that produces vehicles and their components. Its production process generates hazardous and toxic (B3) waste classified as fast moving due to its high volume and frequency. This study aims to determine the standard time for the management process of iron gram B3 waste at PT XYZ. Observations were conducted over 15 cycles, with time recorded at each stage using the stopwatch time study method and adjustments based on the Westinghouse technique. The study was carried out across eight stages of the B3 waste management process at PT XYZ, involving calculations of cycle time, normal time, and standard time. The analysis revealed that the total standard time for the entire process is 42 minutes and 18 seconds. Establishing this standard time supports improved efficiency, prevents waste accumulation, and creates a more structured waste management system that can be periodically evaluated.

Authors

Institutions

Publication Details

Journal
Jurnal Surya Teknika
Published
2025-08-12
DOI
https://doi.org/10.37859/jst.v12i2.9138
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Penentuan Waktu Baku untuk Proses Pengelolaan Limbah B3 di PT XYZ

Ranti Mustika Putri, Alfadhlani Alfadhlani, Prima Fithri, Fahran Zofri
4 links
Jurnal Surya Teknika
Management and Optimization Techniques
article

Penentuan Waktu Baku untuk Proses Pengelolaan Limbah B3 di PT XYZ

Ranti Mustika Putri, Alfadhlani Alfadhlani, Prima Fithri, Fahran Zofri
article en

Abstract

PT XYZ is a manufacturing company in the automotive sector that produces vehicles and their components. Its production process generates hazardous and toxic (B3) waste classified as fast moving due to its high volume and frequency. This study aims to determine the standard time for the management process of iron gram B3 waste at PT XYZ. Observations were conducted over 15 cycles, with time recorded at each stage using the stopwatch time study method and adjustments based on the Westinghouse technique. The study was carried out across eight stages of the B3 waste management process at PT XYZ, involving calculations of cycle time, normal time, and standard time. The analysis revealed that the total standard time for the entire process is 42 minutes and 18 seconds. Establishing this standard time supports improved efficiency, prevents waste accumulation, and creates a more structured waste management system that can be periodically evaluated.

Jurnal Surya TeknikaVol. 12(1)
Andalas University (ID)
Openalex Percentile: Top 69%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Penentuan Waktu Baku untuk Proses Pengelolaan Limbah B3 di PT XYZ — Ranti Mustika Putri, Alfadhlani Alfadhlani, et al. · Jurnal Surya Teknika (2025) | TGRS Research Map | TGRS