Impact of Political Factors on Construction Contract Termination: Empirical Evidence From Ghana

Purpose: This study aims to identify the political factors that lead to the termination of construction contracts in Ghana. Design/Methodology/Approach: A quantitative research design was employed, utilising purposive and random sampling techniques to collect data from 315 respondents, comprising project managers, procurement officers, contract managers, architects, engineers, quantity surveyors, and lecturers from Technical Universities in Ghana. Data were analysed using factor analysis, structural equation modelling (SEM), and confirmatory factor analysis (CFA) to explore the effects of political factors on contract termination. Findings: The results indicate that political factors, including corruption, government violations of clauses, executive leadership changes, poor governance, and a lack of political will, significantly contribute to construction contract terminations. These factors lead to project delays, disputes, and ultimately terminations, highlighting the need for improved governance and risk mitigation strategies in the construction industry. Research Limitation: The study is limited to the construction industry in Ghana and may not account for industry-specific dynamics in other countries. Practical Implication: Suggested measures addressing political instability, improving governance, and minimising political interference could significantly reduce contract terminations in Ghana’s construction sector. Social Implication: There is a need for policy reforms and governance improvements in Ghana’s construction sector. By addressing political instability and promoting transparency, contract terminations could be minimised, leading to better infrastructure development. Originality/Value: This study introduces empirically validated political variables, such as executive leadership change, government clause violations, and a lack of political will and continuity, that expand existing knowledge on construction contract termination.

Authors

Institutions

Publication Details

Journal
African Journal Of Applied Research
Published
2025-08-11
DOI
https://doi.org/10.26437/ajar.v11i3.1161
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Impact of Political Factors on Construction Contract Termination: Empirical Evidence From Ghana

Erastus Mwanaumo, Mundia Muya, Christopher Coleman, D. A. Brobbey
African Journal Of Applied Research
Construction Project Management and Performance
article

Impact of Political Factors on Construction Contract Termination: Empirical Evidence From Ghana

Erastus Mwanaumo, Mundia Muya, Christopher Coleman, D. A. Brobbey
article en

Abstract

Purpose: This study aims to identify the political factors that lead to the termination of construction contracts in Ghana. Design/Methodology/Approach: A quantitative research design was employed, utilising purposive and random sampling techniques to collect data from 315 respondents, comprising project managers, procurement officers, contract managers, architects, engineers, quantity surveyors, and lecturers from Technical Universities in Ghana. Data were analysed using factor analysis, structural equation modelling (SEM), and confirmatory factor analysis (CFA) to explore the effects of political factors on contract termination. Findings: The results indicate that political factors, including corruption, government violations of clauses, executive leadership changes, poor governance, and a lack of political will, significantly contribute to construction contract terminations. These factors lead to project delays, disputes, and ultimately terminations, highlighting the need for improved governance and risk mitigation strategies in the construction industry. Research Limitation: The study is limited to the construction industry in Ghana and may not account for industry-specific dynamics in other countries. Practical Implication: Suggested measures addressing political instability, improving governance, and minimising political interference could significantly reduce contract terminations in Ghana’s construction sector. Social Implication: There is a need for policy reforms and governance improvements in Ghana’s construction sector. By addressing political instability and promoting transparency, contract terminations could be minimised, leading to better infrastructure development. Originality/Value: This study introduces empirically validated political variables, such as executive leadership change, government clause violations, and a lack of political will and continuity, that expand existing knowledge on construction contract termination.

African Journal Of Applied ResearchVol. 11(3)
Cape Coast Technical University (GH), University of Zambia (ZM)
Openalex Percentile: Top 76%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.