Working Method of Column Casting In Residential House Construction Project at Jl. Martimbang No.2

Column work is one of the important stages in constructing a residential house structure, functioning as the main element supporting the load. In the house construction project at Jalan Martimbang No. 2, South Jakarta, the column implementation method is designed to prioritize the accuracy, strength, and durability of the structure. The stages of work include material preparation, formwork manufacture, assembly and installation of reinforcement, and concrete casting according to the established technical specifications. The entire process is carried out by paying attention to quality standards and work safety procedures, as well as considering the conditions of the surrounding environment. With a systematic approach and the use of quality materials, it is expected that the column structures will be able to support the building optimally and meet the planned lifespan of the building.

Authors

Publication Details

Journal
Jurnal Teknik dan Science
Published
2025-06-30
DOI
https://doi.org/10.56127/jts.v4i2.2227
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Working Method of Column Casting In Residential House Construction Project at Jl. Martimbang No.2

Rizal Adi Saputra, Agung Sakti Meldian, Lutfi Hanafi, Aep Saepuloh
Jurnal Teknik dan Science
Geotechnical and construction materials studies
article

Working Method of Column Casting In Residential House Construction Project at Jl. Martimbang No.2

Rizal Adi Saputra, Agung Sakti Meldian, Lutfi Hanafi, Aep Saepuloh
article en

Abstract

Column work is one of the important stages in constructing a residential house structure, functioning as the main element supporting the load. In the house construction project at Jalan Martimbang No. 2, South Jakarta, the column implementation method is designed to prioritize the accuracy, strength, and durability of the structure. The stages of work include material preparation, formwork manufacture, assembly and installation of reinforcement, and concrete casting according to the established technical specifications. The entire process is carried out by paying attention to quality standards and work safety procedures, as well as considering the conditions of the surrounding environment. With a systematic approach and the use of quality materials, it is expected that the column structures will be able to support the building optimally and meet the planned lifespan of the building.

Jurnal Teknik dan ScienceVol. 4(2)
Openalex Percentile: Top 79%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.