Incorporating Cyclic Degradation into Pile Design for the Gull Wing Bridge, Lowestoft

The paper presents the design analysis for the piled support for the rolling bascule Gull Wing Bridge in Lowestoft, England.  The nature of the rolling bascule bridge is that individual pile loads within the pile group vary significantly during each bridge opening event.  This results in the cyclic degradation of the pile shaft resistance, differing from a conventional static pile design where the resisted variable actions are normally only a small component of the total design actions. The approach has been developed using lessons learned from offshore pile design and modified to be appropriate for the design principles of Eurocodes. An additional capacity reduction factor, as a function of the mean and peak cyclic loading and their resulting cyclic degradation of resistances, has been developed and incorporated into the design process. Failure to consider cyclic degradation of the pile shaft capacity would have resulted in the risk of medium to long-term settlement being outside the operational limits for the bridge.

Authors

Publication Details

Published
2025-05-01
DOI
https://doi.org/10.37308/dfieffc25580533
Primary Topic
Geotechnical Engineering and Soil Mechanics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Incorporating Cyclic Degradation into Pile Design for the Gull Wing Bridge, Lowestoft

Shelley Reid
Geotechnical Engineering and Soil Mechanics
article

Incorporating Cyclic Degradation into Pile Design for the Gull Wing Bridge, Lowestoft

Shelley Reid
article en

Abstract

The paper presents the design analysis for the piled support for the rolling bascule Gull Wing Bridge in Lowestoft, England.  The nature of the rolling bascule bridge is that individual pile loads within the pile group vary significantly during each bridge opening event.  This results in the cyclic degradation of the pile shaft resistance, differing from a conventional static pile design where the resisted variable actions are normally only a small component of the total design actions. The approach has been developed using lessons learned from offshore pile design and modified to be appropriate for the design principles of Eurocodes. An additional capacity reduction factor, as a function of the mean and peak cyclic loading and their resulting cyclic degradation of resistances, has been developed and incorporated into the design process. Failure to consider cyclic degradation of the pile shaft capacity would have resulted in the risk of medium to long-term settlement being outside the operational limits for the bridge.

Openalex Percentile: Top 79%
Geotechnical Engineering and Soil Mechanics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.