Terminal Oceacirc;nico in Barra do Dande is planned to be the largest storage infrastructure for gas and oil in Angola. It will include a dedicated 1.7 km long pier and two mooring areas to make the exportation process more efficient. A total of 323 working piles over water, including inclined piles, were designed to serve as foundations for the different structures.  Due to uncertainties from soil investigations in the mooring areas, four push-out pile load tests were conducted to validate and optimise the foundation piles. The Ø700mm cased bore piles, ranging from 31 to 43 meters in length, were built over water and tested using the bi-directional method with the O-Cell® methodology. This eliminated the need for any reaction structure, reducing the overall carbon footprint of the foundation testing program in the most efficient, safe, and cost-effective manner (for all types of piled foundations, particularly for larger test loads). This paper aims to provide a brief overview of the project and the challenges faced during the installation and execution of the four push-out tests over water. The test results and analysis will be presented including the optimisation of the pile foundations.

Authors

Publication Details

Published
2025-05-01
DOI
https://doi.org/10.37308/dfieffc2580537
Primary Topic
Marine and Offshore Engineering Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

O-Cell Methodology Supporting Pile Design Optimisation in Angola

Alberto Rodrigues da Silva
Marine and Offshore Engineering Studies
article

O-Cell Methodology Supporting Pile Design Optimisation in Angola

Alberto Rodrigues da Silva
article en

Abstract

Terminal Oceacirc;nico in Barra do Dande is planned to be the largest storage infrastructure for gas and oil in Angola. It will include a dedicated 1.7 km long pier and two mooring areas to make the exportation process more efficient. A total of 323 working piles over water, including inclined piles, were designed to serve as foundations for the different structures.  Due to uncertainties from soil investigations in the mooring areas, four push-out pile load tests were conducted to validate and optimise the foundation piles. The Ø700mm cased bore piles, ranging from 31 to 43 meters in length, were built over water and tested using the bi-directional method with the O-Cell® methodology. This eliminated the need for any reaction structure, reducing the overall carbon footprint of the foundation testing program in the most efficient, safe, and cost-effective manner (for all types of piled foundations, particularly for larger test loads). This paper aims to provide a brief overview of the project and the challenges faced during the installation and execution of the four push-out tests over water. The test results and analysis will be presented including the optimisation of the pile foundations.

Openalex Percentile: Top 75%
Marine and Offshore Engineering Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

O-Cell Methodology Supporting Pile Design Optimisation in Angola — Alberto Rodrigues da Silva · (2025) | TGRS Research Map | TGRS