How Embracing Engineering Challenges Unlocked the Reduction in Embedded Carbon at the SSTC3 Soil Nailing Project

Commencing in April 2020 and completing in June 2021, Aarsleff Ground Engineering Ltd (a UK subsidiary of Danish construction company Per Aarsleff A/S) undertook the design and installation of soil nailing reinforcement and structural facing for a near 12m high slope inclined at 70° from horizontal. The near 250m length of reinforced slope enabled the excavation for a new highway into the side of an existing slope situated above the old shipyards on the south bank of the River Wear in Sunderland, England. The scheme was developed as an alternative to the originally specified retaining wall consisting of a combi-sheet pile wall supported by ground anchors. This paper studies the reduction in embedded carbon achieved through the alternative scheme but details the complex design and technical management required to unlock this achievement. The awkward geometry; the unpredictable ground conditions; the coordination between excavation works and soil nailing; the specified design working life of 120 years; relic buried structures; and more; all posed challenges from the outset that could have spelt disaster unless managed correctly. The project was a success, and many learned lessons are discussed herein for the technical management of more sustainable yet risky geotechnical methods. &nbsp

Authors

Publication Details

Published
2025-05-01
DOI
https://doi.org/10.37308/dfieffc251140534
Primary Topic
Soil Carbon and Nitrogen Dynamics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

How Embracing Engineering Challenges Unlocked the Reduction in Embedded Carbon at the SSTC3 Soil Nailing Project

A. J. Rogers
Soil Carbon and Nitrogen Dynamics
article

How Embracing Engineering Challenges Unlocked the Reduction in Embedded Carbon at the SSTC3 Soil Nailing Project

A. J. Rogers
article en

Abstract

Commencing in April 2020 and completing in June 2021, Aarsleff Ground Engineering Ltd (a UK subsidiary of Danish construction company Per Aarsleff A/S) undertook the design and installation of soil nailing reinforcement and structural facing for a near 12m high slope inclined at 70° from horizontal. The near 250m length of reinforced slope enabled the excavation for a new highway into the side of an existing slope situated above the old shipyards on the south bank of the River Wear in Sunderland, England. The scheme was developed as an alternative to the originally specified retaining wall consisting of a combi-sheet pile wall supported by ground anchors. This paper studies the reduction in embedded carbon achieved through the alternative scheme but details the complex design and technical management required to unlock this achievement. The awkward geometry; the unpredictable ground conditions; the coordination between excavation works and soil nailing; the specified design working life of 120 years; relic buried structures; and more; all posed challenges from the outset that could have spelt disaster unless managed correctly. The project was a success, and many learned lessons are discussed herein for the technical management of more sustainable yet risky geotechnical methods. &nbsp

Openalex Percentile: Top 74%
Soil Carbon and Nitrogen Dynamics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

How Embracing Engineering Challenges Unlocked the Reduction in Embedded Carbon at the SSTC3 Soil Nailing Project — A. J. Rogers · (2025) | TGRS Research Map | TGRS