Design Oosterweel Link with Preservation of a Historically Protected Building Samga Silo A

In the vicinity of the future Oosterweel Link, which contributes to closing the ring road around Antwerp, the historic masonry building Samga Silo A, built in 1895, is located, near the America docks in the port of Antwerp. Because of its protected status, this building must be preserved intact. This paper presents the various calculations (on behalf of client Lantis and the Rinkoniên Rechtoever contractor consortium) to estimate the possible settlements and associated crack formation in the Samga building, as a result of the construction of the Oosterweel connection and the new landscape design. First, the settlements of the building, due to the very challenging construction of the “canal zone tunnel”, consisting of four traffic tubes between two diaphragm walls with a foundation level at a depth of more than 20m, at a distance of less than 15 m from the corner of this building, were predicted using various Plaxis models. Furthermore, the settlements resulting from the construction of a temporary quay wall and the damping of the nearby dock were calculated. A piling test was also carried out to estimate the accompanying settlements and vibrations. Next, a finite element Diana model of the Samga building allows to estimate the cracking and deformation behavior of the masonry due to the expected settlements, in order to determine the maximum permitted settlement for which the building can be preserved. To meet these settlement limits, the efficiency of different measures during construction are calculated and compared with the  Plaxis models. Finally, the predicted settlements will be monitored as the activities progress. Based on the measurement results, the calculations can be validated and calibrated accordingly, so that timely action can be taken if the settlements exceed the current predictions. Figure 1: BIM-model with Samga Silo A next to canal zone tunnel Oosterweel Link

Authors

Publication Details

Published
2025-05-01
DOI
https://doi.org/10.37308/dfieffc25540412
Primary Topic
Architectural and Urban Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Design Oosterweel Link with Preservation of a Historically Protected Building Samga Silo A

Bart Rombauts
Architectural and Urban Studies
article

Design Oosterweel Link with Preservation of a Historically Protected Building Samga Silo A

Bart Rombauts
article en

Abstract

In the vicinity of the future Oosterweel Link, which contributes to closing the ring road around Antwerp, the historic masonry building Samga Silo A, built in 1895, is located, near the America docks in the port of Antwerp. Because of its protected status, this building must be preserved intact. This paper presents the various calculations (on behalf of client Lantis and the Rinkoniên Rechtoever contractor consortium) to estimate the possible settlements and associated crack formation in the Samga building, as a result of the construction of the Oosterweel connection and the new landscape design. First, the settlements of the building, due to the very challenging construction of the “canal zone tunnel”, consisting of four traffic tubes between two diaphragm walls with a foundation level at a depth of more than 20m, at a distance of less than 15 m from the corner of this building, were predicted using various Plaxis models. Furthermore, the settlements resulting from the construction of a temporary quay wall and the damping of the nearby dock were calculated. A piling test was also carried out to estimate the accompanying settlements and vibrations. Next, a finite element Diana model of the Samga building allows to estimate the cracking and deformation behavior of the masonry due to the expected settlements, in order to determine the maximum permitted settlement for which the building can be preserved. To meet these settlement limits, the efficiency of different measures during construction are calculated and compared with the  Plaxis models. Finally, the predicted settlements will be monitored as the activities progress. Based on the measurement results, the calculations can be validated and calibrated accordingly, so that timely action can be taken if the settlements exceed the current predictions. Figure 1: BIM-model with Samga Silo A next to canal zone tunnel Oosterweel Link

Openalex Percentile: Top 74%
Architectural and Urban Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.