Modern EMC Power Quality Issues: Overvoltage Caused by PV Penetration

Due to the global vision and actions taken to lower the CO2 and decrease the emitted greenhouse gases, there has been a boost and encouragement for deploying photovoltaic systems in Poland and many other countries. However, the extensive installation of photovoltaic units in residential prosumers has led to a new electromagnetic compatibility problem. This problem is the overvoltage resulting from high penetration of the photovoltaic units. Energy companies started to receive complaints from customers about service interruptions. However, in many cases, these overvoltage incidents were not detected by the companies’ metering systems, making it difficult to identify the root cause of the problem. This paper presents a field investigation showing the recognized electromagnetic compatibility issue, highlighting how high PV penetration can lead to overvoltage in the low-voltage distribution network. It also explains why the energy companies fail to detect overvoltage. Additionally, the paper provides insight into the photovoltaic inverters operation and protection in accordance with the IEC standard.

Authors

Institutions

Publication Details

Journal
IEEE Letters on Electromagnetic Compatibility Practice and Applications
Published
2025-08-12
DOI
https://doi.org/10.1109/lemcpa.2025.3598177
Primary Topic
Railway Systems and Energy Efficiency
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Modern EMC Power Quality Issues: Overvoltage Caused by PV Penetration

Amr Madi, Piotr Leżyński, Niek Moonen, Robert Smoleński et al.
IEEE Letters on Electromagnetic Compatibility Practice and Applications
Railway Systems and Energy Efficiency
article

Modern EMC Power Quality Issues: Overvoltage Caused by PV Penetration

Amr Madi, Piotr Leżyński, Niek Moonen, Robert Smoleński, Frank Leferink
article en

Abstract

Due to the global vision and actions taken to lower the CO2 and decrease the emitted greenhouse gases, there has been a boost and encouragement for deploying photovoltaic systems in Poland and many other countries. However, the extensive installation of photovoltaic units in residential prosumers has led to a new electromagnetic compatibility problem. This problem is the overvoltage resulting from high penetration of the photovoltaic units. Energy companies started to receive complaints from customers about service interruptions. However, in many cases, these overvoltage incidents were not detected by the companies’ metering systems, making it difficult to identify the root cause of the problem. This paper presents a field investigation showing the recognized electromagnetic compatibility issue, highlighting how high PV penetration can lead to overvoltage in the low-voltage distribution network. It also explains why the energy companies fail to detect overvoltage. Additionally, the paper provides insight into the photovoltaic inverters operation and protection in accordance with the IEC standard.

IEEE Letters on Electromagnetic Compatibility Practice and ApplicationsVol. 7(4)
University of Zielona Góra (PL), University of Twente (NL)
Affordable and clean energy
Openalex Percentile: Top 71%
Railway Systems and Energy Efficiency
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.