TEV characteristics of GIS enclosure under multiple breakdown conditions of disconnector

Abstract Aiming at the transient process generated by the operation of the disconnector, the fast transient overvoltage (VFTO) transmitted to the casing from the GIS system causes the induced casing voltage between the casing and the ground, posing safety hazards to the secondary equipment and operation personnel of the GIS system. This paper combines the internal VFTO and external TEV transient circuits of GIS, considers the mutual coupling of the three-phase GIS enclosures, establishes a 252 kV GIS system transient model, and studies the characteristics of the three-phase GIS enclosure TEV under multiple breakdown discharge conditions of the disconnector, providing a theoretical basis for the external measurement of the transient induced casing voltage. In the process of multiple breakdown conditions, the maximum TEV value of the operating phase is the highest, with the maximum TEV amplitude reaching 0.03 p.u. in Phase A. TEV amplitude of the operating phase is significantly higher than that of the other two phases.

Authors

Institutions

Publication Details

Journal
Journal of Physics Conference Series
Published
2025-08-01
DOI
https://doi.org/10.1088/1742-6596/3079/1/012016
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

TEV characteristics of GIS enclosure under multiple breakdown conditions of disconnector

J. M. Liu, Huaicheng Wu, Gui Hua Yang, Zhenyang Zu
Journal of Physics Conference Series
Power Systems and Technologies
article

TEV characteristics of GIS enclosure under multiple breakdown conditions of disconnector

J. M. Liu, Huaicheng Wu, Gui Hua Yang, Zhenyang Zu
article en

Abstract

Abstract Aiming at the transient process generated by the operation of the disconnector, the fast transient overvoltage (VFTO) transmitted to the casing from the GIS system causes the induced casing voltage between the casing and the ground, posing safety hazards to the secondary equipment and operation personnel of the GIS system. This paper combines the internal VFTO and external TEV transient circuits of GIS, considers the mutual coupling of the three-phase GIS enclosures, establishes a 252 kV GIS system transient model, and studies the characteristics of the three-phase GIS enclosure TEV under multiple breakdown discharge conditions of the disconnector, providing a theoretical basis for the external measurement of the transient induced casing voltage. In the process of multiple breakdown conditions, the maximum TEV value of the operating phase is the highest, with the maximum TEV amplitude reaching 0.03 p.u. in Phase A. TEV amplitude of the operating phase is significantly higher than that of the other two phases.

Journal of Physics Conference SeriesVol. 3079(1)
State Grid Corporation of China (China) (CN)
Openalex Percentile: Top 81%
Power Systems and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.