Simulation Research on Lightning Withstand Level of $500 \text{kV} / \pm 800 \text{kV}$ Hybrid Tower Large Crossing Transmission Line Considering Leader Current

The project involved in the calculation of this paper is a large crossing project with hybrid voltage, which is characterized by high towers, long spanning distance, and hybrid voltage, etc. The lightning performance calculation for it should have better accuracy and higher efficiency compared with that of general transmission line. However, the present insulator string flashover calculation based on the leader development method usually ignores the leader current, in order to more accurately calculate the lightning withstand level of the AC/DC hybrid tower in the large crossing section, this paper establishes a leader development model considering the leader current through ATP/EMTP, and calculates the leader development speed and leader current based on the recommended formula of CIGRE, and adopts a controllable time-varying resistor in the EMTP/ATP, In EMTP/ATP, the flashover model of insulator string considering leader current is established by using controllable time-varying resistance, TACS controllable switch and MODEL module, and the simulation study on the lightning withstand level of <tex xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">$500 \text{kV} / \pm 800 \text{kV}$</tex> AC/DC hybrid tower transmission line.

Authors

Institutions

Publication Details

Published
2025-06-17
DOI
https://doi.org/10.1109/apl65034.2025.11108719
Primary Topic
High-Voltage Power Transmission Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Simulation Research on Lightning Withstand Level of $500 \text{kV} / \pm 800 \text{kV}$ Hybrid Tower Large Crossing Transmission Line Considering Leader Current

Tian‐Ling Ren, Xiaoqi Wu, Junjie Si, Yuan Yang et al.
High-Voltage Power Transmission Systems
article

Simulation Research on Lightning Withstand Level of $500 \text{kV} / \pm 800 \text{kV}$ Hybrid Tower Large Crossing Transmission Line Considering Leader Current

Tian‐Ling Ren, Xiaoqi Wu, Junjie Si, Yuan Yang, Ying Liu, Siyi Feng, Shengcong Chai, Xiaoyue Chen
article en

Abstract

The project involved in the calculation of this paper is a large crossing project with hybrid voltage, which is characterized by high towers, long spanning distance, and hybrid voltage, etc. The lightning performance calculation for it should have better accuracy and higher efficiency compared with that of general transmission line. However, the present insulator string flashover calculation based on the leader development method usually ignores the leader current, in order to more accurately calculate the lightning withstand level of the AC/DC hybrid tower in the large crossing section, this paper establishes a leader development model considering the leader current through ATP/EMTP, and calculates the leader development speed and leader current based on the recommended formula of CIGRE, and adopts a controllable time-varying resistor in the EMTP/ATP, In EMTP/ATP, the flashover model of insulator string considering leader current is established by using controllable time-varying resistance, TACS controllable switch and MODEL module, and the simulation study on the lightning withstand level of <tex xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">$500 \text{kV} / \pm 800 \text{kV}$</tex> AC/DC hybrid tower transmission line.

Wuhan University (CN), Shanghai Electric (China) (CN), China Power Engineering Consulting Group (China) (CN)
Climate action
Openalex Percentile: Top 81%
High-Voltage Power Transmission Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Simulation Research on Lightning Withstand Level of $500 \text{kV} / \pm 800 \text{kV}$ Hybrid Tower Large Crossing Transmission Line Considering Leader Current — Tian‐Ling Ren, Xiaoqi Wu, et al. · (2025) | TGRS Research Map | TGRS