Proactively Managing Hazards to Enhance SSoW in Well Intervention Operations – A Case Study

Abstract Well intervention operations are essential for maintaining and enhancing the productivity of oil and gas wells. This paper discusses hazard management framework that integrates techniques to enhance safety and efficiency at worksites during Well intervention campaign – Closed-In Well Restoration (CIWR) – operations. The paper Illustrates the application of proactive measures including contractor pre-mobilization and engagements that created desired alignment and delivery of HSE expectations as well as an enhanced Safe Systems of Work (SSoW) and adaptive Permit to Work protocols that delivered over 200,000 man-hours of intense sitework over a period of 8 months without an LTI. The campaign employed the use of several Contractors rendering various wells and subsurface services – wellhead maintenance, slickline, electric line, coiled tubing for pumping and stimulation, etc. The result highlights improvements in operational safety, reduced downtime, and increased compliance with industry standards and regulatory requirements. This paper emphasizes the critical role of proactive engagement for alignment and effective monitoring as a transformative approach to hazard management, offering practical insights for operators seeking to advance safety culture and operational excellence in intervention activities.

Authors

Institutions

Publication Details

Journal
SPE Nigeria Annual International Conference and Exhibition
Published
2025-08-04
DOI
https://doi.org/10.2118/228804-ms
Primary Topic
Risk and Safety Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Proactively Managing Hazards to Enhance SSoW in Well Intervention Operations – A Case Study

S. I. Ikirodah, S. P. Gondo
SPE Nigeria Annual International Conference and Exhibition
Risk and Safety Analysis
article

Proactively Managing Hazards to Enhance SSoW in Well Intervention Operations – A Case Study

S. I. Ikirodah, S. P. Gondo
article en

Abstract

Abstract Well intervention operations are essential for maintaining and enhancing the productivity of oil and gas wells. This paper discusses hazard management framework that integrates techniques to enhance safety and efficiency at worksites during Well intervention campaign – Closed-In Well Restoration (CIWR) – operations. The paper Illustrates the application of proactive measures including contractor pre-mobilization and engagements that created desired alignment and delivery of HSE expectations as well as an enhanced Safe Systems of Work (SSoW) and adaptive Permit to Work protocols that delivered over 200,000 man-hours of intense sitework over a period of 8 months without an LTI. The campaign employed the use of several Contractors rendering various wells and subsurface services – wellhead maintenance, slickline, electric line, coiled tubing for pumping and stimulation, etc. The result highlights improvements in operational safety, reduced downtime, and increased compliance with industry standards and regulatory requirements. This paper emphasizes the critical role of proactive engagement for alignment and effective monitoring as a transformative approach to hazard management, offering practical insights for operators seeking to advance safety culture and operational excellence in intervention activities.

SPE Nigeria Annual International Conference and Exhibition
NPO Energomash (Russia) (RU)
Openalex Percentile: Top 74%
Risk and Safety Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Proactively Managing Hazards to Enhance SSoW in Well Intervention Operations – A Case Study — S. I. Ikirodah, S. P. Gondo · SPE Nigeria Annual International Conference and Exhibition (2025) | TGRS Research Map | TGRS