Study on the influence of blasting on the structural stability of newly-built and adjacent tunnels

With the rapid development of urban underground spaces, newly constructed tunnels are being constructed increasingly closer to existing ones. In such cases, blasting may cause overbreak and underbreak, potentially compromising both the structural stability of the new tunnels and the operational safety of adjacent tunnels. In this study, we investigated the double-track tunnel project in Chongqing University Town; the blasting operation was classified into the blasting action period (from the beginning to load termination of blasting) and the overbreak period (from blasting termination to surrounding rock deformation stability). Overbreak and underbreak distribution data were acquired through self-developed blasthole detection devices and laser profile scanners. Using numerical models constructed with LS-DYNA and ANSYS, this study systematically analyzed the dynamic response characteristics of the blasting process of the newly-built tunnel and its effect on the structural stability of adjacent tunnels. Finite element simulation results using intelligent detection data matched the measured excavation contour with over 85% accuracy, revealing the correlation between the blasthole position offset and overbreak position and amount. During the formation period of overbreak in the newly-built tunnels, the section displacement attenuated gradually, and irregular contours increased the tensile stress concentration and rockfall risk. Moreover, uniform overbreak of the entire contour of the section decreased the stress concentration. During the blasting period of the adjacent tunnel, the overbreak and underbreak positions significantly affected the internal force on the lining of the adjacent tunnel. A prominent stress response of the vault and arch bottom was observed. The vibration velocity of the lining of the adjacent tunnel was positively correlated with the contour radius, and was regulated by the loading state at different positions. Therefore, blasting operations in new tunnels should take into account the void position of the adjacent tunnel base. During the formation period of overbreak of the adjacent tunnel, overbreak had a weak influence on the lining displacement, and excavation unloading dominated surrounding rock displacement. The peak stress was concentrated at the center and lower side of the arch foot, and the inner side of the arch bottom experienced tensile stress over a large area. Thus, the positions adjacent to the arch foot and arch bottom of the tunnel should be carefully considered in the construction of new tunnels.

Authors

Institutions

Publication Details

Journal
Scientific Reports
Published
2025-08-12
DOI
https://doi.org/10.1038/s41598-025-15243-x
Citations
2
Primary Topic
Rock Mechanics and Modeling
Type
article
Field-Weighted Citation Impact
1.73

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Study on the influence of blasting on the structural stability of newly-built and adjacent tunnels

Ziqiang Li, Jia-Shuai Zhang, Zonghong Zhou, Shengliang Pu et al.
2 citations
Scientific Reports
Rock Mechanics and Modeling
1.73
article

Study on the influence of blasting on the structural stability of newly-built and adjacent tunnels

Ziqiang Li, Jia-Shuai Zhang, Zonghong Zhou, Shengliang Pu, Ceng Zeng, Guowei Ma
article en
2 citations

Abstract

With the rapid development of urban underground spaces, newly constructed tunnels are being constructed increasingly closer to existing ones. In such cases, blasting may cause overbreak and underbreak, potentially compromising both the structural stability of the new tunnels and the operational safety of adjacent tunnels. In this study, we investigated the double-track tunnel project in Chongqing University Town; the blasting operation was classified into the blasting action period (from the beginning to load termination of blasting) and the overbreak period (from blasting termination to surrounding rock deformation stability). Overbreak and underbreak distribution data were acquired through self-developed blasthole detection devices and laser profile scanners. Using numerical models constructed with LS-DYNA and ANSYS, this study systematically analyzed the dynamic response characteristics of the blasting process of the newly-built tunnel and its effect on the structural stability of adjacent tunnels. Finite element simulation results using intelligent detection data matched the measured excavation contour with over 85% accuracy, revealing the correlation between the blasthole position offset and overbreak position and amount. During the formation period of overbreak in the newly-built tunnels, the section displacement attenuated gradually, and irregular contours increased the tensile stress concentration and rockfall risk. Moreover, uniform overbreak of the entire contour of the section decreased the stress concentration. During the blasting period of the adjacent tunnel, the overbreak and underbreak positions significantly affected the internal force on the lining of the adjacent tunnel. A prominent stress response of the vault and arch bottom was observed. The vibration velocity of the lining of the adjacent tunnel was positively correlated with the contour radius, and was regulated by the loading state at different positions. Therefore, blasting operations in new tunnels should take into account the void position of the adjacent tunnel base. During the formation period of overbreak of the adjacent tunnel, overbreak had a weak influence on the lining displacement, and excavation unloading dominated surrounding rock displacement. The peak stress was concentrated at the center and lower side of the arch foot, and the inner side of the arch bottom experienced tensile stress over a large area. Thus, the positions adjacent to the arch foot and arch bottom of the tunnel should be carefully considered in the construction of new tunnels.

Scientific ReportsVol. 15(1)
Chongqing University of Science and Technology (CN), Metallurgical Corporation of China (China) (CN)
Chongqing University, Centre Scientifique et Technique du Bâtiment, Chongqing Construction Science and Technology Plan Project
Sustainable cities and communities
Openalex Percentile: Top 16%
Rock Mechanics and Modeling
1.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.