Research on Variable Cost Compensation Problem in the Electricity Market Based on the Bilevel Optimization Model

This paper establishes a bilevel optimization model with the optimal bidding on the power generation side as the upper layer and market clearing as the lower layer. Based on a 5node system, this paper discusses the impact of two types of government-driven modules, price government-authorized price difference contracts and variable cost compensation, on unit revenue and market equilibrium results in different scenarios such as different game types, different variable cost subsidy benchmarks, and different price difference contracts. The results of the example show that variable cost compensation may cause high-cost units to declare a price lower than their own cost to obtain a higher bid power and earn excess profits. If the contract price of the price difference contract is set lower than the node power price of the unit's spot, it may cause the unit to miss out on obtaining higher profits in the spot market. If the contract price of the price difference contract is set unreasonably, the larger the proportion of contract power is, the more likely it is that the unit will suffer losses.

Authors

Institutions

Publication Details

Published
2025-05-23
DOI
https://doi.org/10.1109/etae65337.2025.11089790
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Variable Cost Compensation Problem in the Electricity Market Based on the Bilevel Optimization Model

Yuxuan Zhao, Shangchou Zhou, Zhongfei Chen, Chuan Liu et al.
Electric Power System Optimization
article

Research on Variable Cost Compensation Problem in the Electricity Market Based on the Bilevel Optimization Model

Yuxuan Zhao, Shangchou Zhou, Zhongfei Chen, Chuan Liu, Yupeng Li, Qiaoyu Zhang, Chao Gong, Qiuna Cai
article en

Abstract

This paper establishes a bilevel optimization model with the optimal bidding on the power generation side as the upper layer and market clearing as the lower layer. Based on a 5node system, this paper discusses the impact of two types of government-driven modules, price government-authorized price difference contracts and variable cost compensation, on unit revenue and market equilibrium results in different scenarios such as different game types, different variable cost subsidy benchmarks, and different price difference contracts. The results of the example show that variable cost compensation may cause high-cost units to declare a price lower than their own cost to obtain a higher bid power and earn excess profits. If the contract price of the price difference contract is set lower than the node power price of the unit's spot, it may cause the unit to miss out on obtaining higher profits in the spot market. If the contract price of the price difference contract is set unreasonably, the larger the proportion of contract power is, the more likely it is that the unit will suffer losses.

China Southern Power Grid (China) (CN), Power Grid Corporation (India) (IN), South China University of Technology (CN)
Openalex Percentile: Top 82%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.