Research on Deployment Strategy of High Reliability Energy Metering Device Before Disaster Based on Genetic Algorithm

With the frequent occurrence of climate change, the flood disaster risk of power system is increasing, which puts forward higher requirements for the reliability and data accuracy of electric energy metering devices. In order to deal with the deployment problem of high reliability metering device before disaster, this paper puts forward a strategy of deploying high reliability metering device before disaster based on genetic algorithm. By combining geographic information system (GIS), meteorological data, historical disaster information, load capacity and other factors, an optimization model is constructed to achieve the minimum deployment number and the maximum degree of power metering reliability, and reduce the loss in flood disasters. Through the optimization process of genetic algorithm (GA), the optimal deployment strategy of pre-disaster metering device is sought. The research of this paper provides a new idea and method for disaster management of power system.

Authors

Publication Details

Published
2025-05-23
DOI
https://doi.org/10.1109/etae65337.2025.11089716
Primary Topic
Power Systems and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Deployment Strategy of High Reliability Energy Metering Device Before Disaster Based on Genetic Algorithm

Tao Liao, Lei Yang, Guohui Wang, Xin Chen et al.
1 links
Power Systems and Technologies
article

Research on Deployment Strategy of High Reliability Energy Metering Device Before Disaster Based on Genetic Algorithm

Tao Liao, Lei Yang, Guohui Wang, Xin Chen, Bingyang Li, Huiyong Luo
article en

Abstract

With the frequent occurrence of climate change, the flood disaster risk of power system is increasing, which puts forward higher requirements for the reliability and data accuracy of electric energy metering devices. In order to deal with the deployment problem of high reliability metering device before disaster, this paper puts forward a strategy of deploying high reliability metering device before disaster based on genetic algorithm. By combining geographic information system (GIS), meteorological data, historical disaster information, load capacity and other factors, an optimization model is constructed to achieve the minimum deployment number and the maximum degree of power metering reliability, and reduce the loss in flood disasters. Through the optimization process of genetic algorithm (GA), the optimal deployment strategy of pre-disaster metering device is sought. The research of this paper provides a new idea and method for disaster management of power system.

Climate action
Openalex Percentile: Top 82%
Power Systems and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.