The Design of the New $\pm 525 \text{kV}$ HVDC Overhead Line Tower for the Crossing of PO River

The Hypergrid project, presented for the first time by the italian TSO in the 2023 Grid Development Plan, foresees the construction of new <tex xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">$\pm 525 \text{kV}$</tex> dc overhead lines (OHLs) to replace the existing 400 kV ac OHLs. One of the first overhead lines to be implemented is the Milano-Montalto link. This connection will consist of an undersea cable from Montalto to La Spezia and an overhead line from La Spezia to Milano. This line presents specific challenges, such as crossing the Tuscan-Emilian Apennines, where intense rime ice phenomena occur, and crossing the Po River. Regarding the latter, it was necessary to design a special tower to enable the crossing of the Po River. The considerable height of the tower (about 120 meters), the great span length and the high rated voltage require specific design choices to ensure an acceptable lightning fault rate and adequate clearances. The paper describes the constraints and studies conducted to achieve a sustainable design of the infrastructure.

Authors

Institutions

Publication Details

Published
2025-05-29
DOI
https://doi.org/10.1109/aeithvdc66044.2025.11079543
Citations
1
Primary Topic
High-Voltage Power Transmission Systems
Type
article
Field-Weighted Citation Impact
0.73
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

The Design of the New $\pm 525 \text{kV}$ HVDC Overhead Line Tower for the Crossing of PO River

Luca Buono, Francesco Palone, Lorenzo Papi, Roberto Spezie et al.
1 citations
High-Voltage Power Transmission Systems
0.73
article

The Design of the New $\pm 525 \text{kV}$ HVDC Overhead Line Tower for the Crossing of PO River

Luca Buono, Francesco Palone, Lorenzo Papi, Roberto Spezie, Pierluigi Vacante, Gaia Leone, Alessia Moresi
article en
1 citations

Abstract

The Hypergrid project, presented for the first time by the italian TSO in the 2023 Grid Development Plan, foresees the construction of new <tex xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink">$\pm 525 \text{kV}$</tex> dc overhead lines (OHLs) to replace the existing 400 kV ac OHLs. One of the first overhead lines to be implemented is the Milano-Montalto link. This connection will consist of an undersea cable from Montalto to La Spezia and an overhead line from La Spezia to Milano. This line presents specific challenges, such as crossing the Tuscan-Emilian Apennines, where intense rime ice phenomena occur, and crossing the Po River. Regarding the latter, it was necessary to design a special tower to enable the crossing of the Po River. The considerable height of the tower (about 120 meters), the great span length and the high rated voltage require specific design choices to ensure an acceptable lightning fault rate and adequate clearances. The paper describes the constraints and studies conducted to achieve a sustainable design of the infrastructure.

Terna (Italy) (IT)
Sustainable cities and communities
Openalex Percentile: Top 25%
High-Voltage Power Transmission Systems
0.73
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.