Analysis Time and Cost Control in Ship Hull Construction Projects at PT. Bengkulu SamuderaTehnik

The purpose of the research is to analyze the implementation of ship body construction project work at PT. Bengkulu SamuderaTehnik, analyze time and cost performance by assessing performance based on project performance indicators and analyze control with acceleration of time and cost performance of project implementation. The method used in this analysis is the Earned Value Method (EVM) to assess time and cost performance through time and cost performance indicators. EVM analysis is carried out by calculating the PV, EV and AC values based on time schedule data, RAB, and work progress data. Based on the PV, EV and AC values, an analysis of time and cost performance indicators can be carried out by analyzing the Schedule Variance ( SV), Schedule Performance Index (SPI), Cost Variance ( CV) and Cost Performance Index (CPI) value indicators. Control analysis using the Time Cost Trade Off (TCTO) method for the remaining time that has been calculated. The results of the research analysis on the ship body construction project at PT Bengkulu SamuderaTehnik are the project experience delay than planned with SPI index is 0.7 < 1, and the costs incurred more small from the budget with CPI Index 1.4 > 1. Implementation Time remaining is 19 Weeks and For Cost remaining is as big as Rp.9,685,719,731 . Control acceleration time done with the TCTO Method and the selected alternatives is with addition power work on the track critical that is work construction and work piping . Implementation time shortened by 7 weeks from 25 Weeks normal duration for reach remainder time work at the end project that is 19 Weeks . With Crash Cost is as big as for each job in succession is Rp . 80,978,036 for construction work and Rp. 126,040,853 for piping system work

Authors

Publication Details

Journal
Journal of architecture and civil engineering.
Published
2025-08-01
DOI
https://doi.org/10.35629/8193-10081016
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis Time and Cost Control in Ship Hull Construction Projects at PT. Bengkulu SamuderaTehnik

Fabianus Hambu, LaluMulyadi LaluMulyadi, LiesKurniawati Wulandari
Journal of architecture and civil engineering.
Management and Optimization Techniques
article

Analysis Time and Cost Control in Ship Hull Construction Projects at PT. Bengkulu SamuderaTehnik

Fabianus Hambu, LaluMulyadi LaluMulyadi, LiesKurniawati Wulandari
article en

Abstract

The purpose of the research is to analyze the implementation of ship body construction project work at PT. Bengkulu SamuderaTehnik, analyze time and cost performance by assessing performance based on project performance indicators and analyze control with acceleration of time and cost performance of project implementation. The method used in this analysis is the Earned Value Method (EVM) to assess time and cost performance through time and cost performance indicators. EVM analysis is carried out by calculating the PV, EV and AC values based on time schedule data, RAB, and work progress data. Based on the PV, EV and AC values, an analysis of time and cost performance indicators can be carried out by analyzing the Schedule Variance ( SV), Schedule Performance Index (SPI), Cost Variance ( CV) and Cost Performance Index (CPI) value indicators. Control analysis using the Time Cost Trade Off (TCTO) method for the remaining time that has been calculated. The results of the research analysis on the ship body construction project at PT Bengkulu SamuderaTehnik are the project experience delay than planned with SPI index is 0.7 < 1, and the costs incurred more small from the budget with CPI Index 1.4 > 1. Implementation Time remaining is 19 Weeks and For Cost remaining is as big as Rp.9,685,719,731 . Control acceleration time done with the TCTO Method and the selected alternatives is with addition power work on the track critical that is work construction and work piping . Implementation time shortened by 7 weeks from 25 Weeks normal duration for reach remainder time work at the end project that is 19 Weeks . With Crash Cost is as big as for each job in succession is Rp . 80,978,036 for construction work and Rp. 126,040,853 for piping system work

Journal of architecture and civil engineering.Vol. 10(8)
Openalex Percentile: Top 70%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analysis Time and Cost Control in Ship Hull Construction Projects at PT. Bengkulu SamuderaTehnik — Fabianus Hambu, LaluMulyadi LaluMulyadi, et al. · Journal of architecture and civil engineering. (2025) | TGRS Research Map | TGRS