Managing Cost and Schedule Risks in High-Rise Building Projects: A Case Study from Jakarta, Indonesia

Building construction projects are inherently complex and exposed to various risks that may significantly affect project performance, particularly in terms of cost and time. This study investigates risk management practices from the perspective of the contractor on the XY Building Construction Project in Jakarta, Indonesia. A qualitative descriptive methodology was employed, involving literature review, expert interviews, and structured questionnaires to identify potential risks. Risk analysis was conducted using the Probability Impact Matrix (PIM) method, where 32 risk factors were identified and validated by experienced professionals. From the analysis, five dominant risks were categorized as high-priority, including, target production shortfalls, delays in external approvals, late material deliveries, inefficient management coordination, and limited access for heavy equipment. Appropriate mitigation strategies were formulated based on expert responses, including improved onsite management, vendor diversification, and traffic coordination for equipment access. These strategies aim to minimize the impact of critical risks and enhance project delivery efficiency. The findings contribute to a better understanding of risk prioritization and practical response planning in high-risk building construction environments.

Authors

Institutions

Publication Details

Journal
Journal of architecture and civil engineering.
Published
2025-08-01
DOI
https://doi.org/10.35629/8193-10080109
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Managing Cost and Schedule Risks in High-Rise Building Projects: A Case Study from Jakarta, Indonesia

Arman Jayady, Fitri Suryani, Alifia Indra Septiaji
Journal of architecture and civil engineering.
Construction Project Management and Performance
article

Managing Cost and Schedule Risks in High-Rise Building Projects: A Case Study from Jakarta, Indonesia

Arman Jayady, Fitri Suryani, Alifia Indra Septiaji
article en

Abstract

Building construction projects are inherently complex and exposed to various risks that may significantly affect project performance, particularly in terms of cost and time. This study investigates risk management practices from the perspective of the contractor on the XY Building Construction Project in Jakarta, Indonesia. A qualitative descriptive methodology was employed, involving literature review, expert interviews, and structured questionnaires to identify potential risks. Risk analysis was conducted using the Probability Impact Matrix (PIM) method, where 32 risk factors were identified and validated by experienced professionals. From the analysis, five dominant risks were categorized as high-priority, including, target production shortfalls, delays in external approvals, late material deliveries, inefficient management coordination, and limited access for heavy equipment. Appropriate mitigation strategies were formulated based on expert responses, including improved onsite management, vendor diversification, and traffic coordination for equipment access. These strategies aim to minimize the impact of critical risks and enhance project delivery efficiency. The findings contribute to a better understanding of risk prioritization and practical response planning in high-risk building construction environments.

Journal of architecture and civil engineering.Vol. 10(8)
Universitas Persada Indonesia Yayasan Administrasi Indonesia (ID)
Openalex Percentile: Top 77%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.