Integrated Characterization of Fault and Top Seal at Velocette: Understanding Trap Fill, Breach and Depletion Mechanisms

Summary Exploration well 6607/3-1S (Velocette) marks the first significant penetration of sandy intervals within the Cretaceous Nise Formation on the eastern flank of the Utgard High. A 9-meter gas column was encountered in the upper section of the reservoir, with a total confirmed trap column of approximately 66 meters. Post-well studies focused on understanding the reason for reduction in column height from a pre-drill estimate of 240 meters to a post-drill column of 66 meters. Laboratory analyses showed that the top seal could support a gas column of over 3700 meters, and mechanical seal strength indicated a headspace of more than 58 bar before failure. Therefore, the top seal is not the limiting factor for the trapped column. Fault membrane seal analysis revealed that while most of the Velocette relies on sand-shale juxtaposition, the areas relying on the membrane fault seal can accommodate a column larger than 140 meters. Thus, the fault membrane seal is not the limiting factor for the observed column. A fault reactivation study showed that the bounding faults are critically stressed under current pore pressure conditions, suggesting that any increase in pore pressure could induce fault reactivation.

Authors

Institutions

Publication Details

Published
2025-01-01
DOI
https://doi.org/10.3997/2214-4609.202532020
Primary Topic
Mechanical stress and fatigue analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Integrated Characterization of Fault and Top Seal at Velocette: Understanding Trap Fill, Breach and Depletion Mechanisms

Waqas Ahmed, K. Dindane, A. Biliuta
Mechanical stress and fatigue analysis
article

Integrated Characterization of Fault and Top Seal at Velocette: Understanding Trap Fill, Breach and Depletion Mechanisms

Waqas Ahmed, K. Dindane, A. Biliuta
article en

Abstract

Summary Exploration well 6607/3-1S (Velocette) marks the first significant penetration of sandy intervals within the Cretaceous Nise Formation on the eastern flank of the Utgard High. A 9-meter gas column was encountered in the upper section of the reservoir, with a total confirmed trap column of approximately 66 meters. Post-well studies focused on understanding the reason for reduction in column height from a pre-drill estimate of 240 meters to a post-drill column of 66 meters. Laboratory analyses showed that the top seal could support a gas column of over 3700 meters, and mechanical seal strength indicated a headspace of more than 58 bar before failure. Therefore, the top seal is not the limiting factor for the trapped column. Fault membrane seal analysis revealed that while most of the Velocette relies on sand-shale juxtaposition, the areas relying on the membrane fault seal can accommodate a column larger than 140 meters. Thus, the fault membrane seal is not the limiting factor for the observed column. A fault reactivation study showed that the bounding faults are critically stressed under current pore pressure conditions, suggesting that any increase in pore pressure could induce fault reactivation.

OMV (Austria) (AT)
Climate action
Openalex Percentile: Top 78%
Mechanical stress and fatigue analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Integrated Characterization of Fault and Top Seal at Velocette: Understanding Trap Fill, Breach and Depletion Mechanisms — Waqas Ahmed, K. Dindane, et al. · (2025) | TGRS Research Map | TGRS