Pricing in the Direct Supply of Construction Components

This article aims to conduct a comprehensive study of the economic and logistical factors that determine the formation of the final price when abandoning multi-stage intermediary chains in favor of the factory-to-site model. The relevance of the work is due to the high level of cumulative markups in the classical supply scheme, especially for developing landlocked markets, where transport and warehousing costs multiply the price of building materials and hinder the introduction of innovative solutions in infrastructure projects. The novelty of the research lies in combining quantitative analysis of marginal markups (using the Lerner index and PPI data), logistical assessment of hidden costs (according to UNCTAD and SCFI data), modeling of currency effects based on historical exchange rates, and practical case analysis of pilot projects in Kyrgyzstan, during which empirical confirmation of the claimed savings was obtained. As a result of a comparative analysis of the traditional and direct supply models, it was found that eliminating national distributors, wholesale warehouses, and retailers ensures a reduction in the final cost of supplies by 30–40 % through the removal of the accumulated markups at each link. Additional savings are achieved through factory cutting of materials to order size, just-in-time delivery, optimization of warehousing and installation operations within a lean approach, as well as the use of currency risk hedging instruments. The factory-to-site model demonstrates high transparency of cost structure and scalability of the methodology to neighboring markets, which is confirmed by an increase in annual turnover from $0.5 million to over $6 million with supply volumes increasing up to 100,000 m². The article will be useful for procurement managers, logisticians, investment analysts, and government specialists in the regulation of the construction market.

Authors

Publication Details

Journal
The American Journal of Management and Economics Innovations
Published
2025-07-19
DOI
https://doi.org/10.37547/tajmei/volume07issue07-11
Primary Topic
Urban Transport Systems Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Pricing in the Direct Supply of Construction Components

Elmurat Erkin uulu
The American Journal of Management and Economics Innovations
Urban Transport Systems Analysis
article

Pricing in the Direct Supply of Construction Components

Elmurat Erkin uulu
article en

Abstract

This article aims to conduct a comprehensive study of the economic and logistical factors that determine the formation of the final price when abandoning multi-stage intermediary chains in favor of the factory-to-site model. The relevance of the work is due to the high level of cumulative markups in the classical supply scheme, especially for developing landlocked markets, where transport and warehousing costs multiply the price of building materials and hinder the introduction of innovative solutions in infrastructure projects. The novelty of the research lies in combining quantitative analysis of marginal markups (using the Lerner index and PPI data), logistical assessment of hidden costs (according to UNCTAD and SCFI data), modeling of currency effects based on historical exchange rates, and practical case analysis of pilot projects in Kyrgyzstan, during which empirical confirmation of the claimed savings was obtained. As a result of a comparative analysis of the traditional and direct supply models, it was found that eliminating national distributors, wholesale warehouses, and retailers ensures a reduction in the final cost of supplies by 30–40 % through the removal of the accumulated markups at each link. Additional savings are achieved through factory cutting of materials to order size, just-in-time delivery, optimization of warehousing and installation operations within a lean approach, as well as the use of currency risk hedging instruments. The factory-to-site model demonstrates high transparency of cost structure and scalability of the methodology to neighboring markets, which is confirmed by an increase in annual turnover from $0.5 million to over $6 million with supply volumes increasing up to 100,000 m². The article will be useful for procurement managers, logisticians, investment analysts, and government specialists in the regulation of the construction market.

The American Journal of Management and Economics InnovationsVol. 07(07)
Industry, innovation and infrastructure
Openalex Percentile: Top 80%
Urban Transport Systems Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Pricing in the Direct Supply of Construction Components — Elmurat Erkin uulu · The American Journal of Management and Economics Innovations (2025) | TGRS Research Map | TGRS